  "actors": [
    {
      "id": "OPENAI",
      "label": "OpenAI",
      "layer": "labs",
      "name": "OpenAI",
      "note": "",
      "origin": "upstream",
      "shape": "hexagon",
      "type": "lab"
    },
    {
      "id": "META",
      "label": "Meta",
      "layer": "labs",
      "name": "Meta Platforms",
      "note": "",
      "origin": "upstream",
      "shape": "hexagon",
      "type": "lab"
    },
    {
      "id": "MSFT",
      "label": "Microsoft",
      "layer": "cloud",
      "name": "Microsoft / Azure",
      "note": "",
      "origin": "upstream",
      "shape": "rounded",
      "type": "hyperscaler"
    },
    {
      "id": "AMZN",
      "label": "Amazon",
      "layer": "cloud",
      "name": "Amazon / AWS",
      "note": "",
      "origin": "upstream",
      "shape": "rounded",
      "type": "hyperscaler"
    },
    {
      "id": "GOOG",
      "label": "Google",
      "layer": "cloud",
      "name": "Google / Google Cloud",
      "note": "",
      "origin": "upstream",
      "shape": "rounded",
      "type": "hyperscaler"
    },
    {
      "id": "SBENERGY",
      "label": "SB Energy",
      "layer": "cloud",
      "name": "SB Energy",
      "note": "",
      "origin": "upstream",
      "shape": "cut",
      "type": "builder"
    },
    {
      "id": "NVDA",
      "label": "NVIDIA",
      "layer": "silicon",
      "name": "NVIDIA",
      "note": "",
      "origin": "upstream",
      "shape": "chip",
      "type": "chip"
    },
    {
      "id": "CEG",
      "label": "Constellation",
      "layer": "power",
      "name": "Constellation Energy",
      "note": "",
      "origin": "upstream",
      "shape": "circle",
      "type": "generator"
    },
    {
      "id": "NEE",
      "label": "NextEra",
      "layer": "power",
      "name": "NextEra Energy",
      "note": "",
      "origin": "upstream",
      "shape": "circle",
      "type": "generator"
    },
    {
      "id": "KAIROS",
      "label": "Kairos Power",
      "layer": "power",
      "name": "Kairos Power",
      "note": "",
      "origin": "upstream",
      "shape": "circle",
      "type": "generator"
    },
    {
      "id": "XENERGY",
      "label": "X-energy",
      "layer": "power",
      "name": "X-energy",
      "note": "",
      "origin": "upstream",
      "shape": "circle",
      "type": "generator"
    },
    {
      "id": "AEP",
      "label": "AEP",
      "layer": "power",
      "name": "American Electric Power",
      "note": "",
      "origin": "upstream",
      "shape": "ring",
      "type": "utility"
    },
    {
      "id": "ENTERGY",
      "label": "Entergy",
      "layer": "power",
      "name": "Entergy utilities (Louisiana and Arkansas)",
      "note": "",
      "origin": "upstream",
      "shape": "ring",
      "type": "utility"
    },
    {
      "id": "RTOS",
      "label": "6 RTOs/ISOs",
      "layer": "power",
      "name": "PJM, MISO, SPP, CAISO, ISO-NE, NYISO",
      "note": "",
      "origin": "upstream",
      "shape": "ring",
      "type": "grid_operator"
    },
    {
      "id": "FERC",
      "label": "FERC",
      "layer": "policy",
      "name": "Federal Energy Regulatory Commission",
      "note": "",
      "origin": "upstream",
      "shape": "shield",
      "type": "regulator"
    },
    {
      "id": "NRC",
      "label": "NRC",
      "layer": "policy",
      "name": "U.S. Nuclear Regulatory Commission",
      "note": "",
      "origin": "upstream",
      "shape": "shield",
      "type": "regulator"
    },
    {
      "id": "DOE",
      "label": "DOE",
      "layer": "policy",
      "name": "U.S. Department of Energy",
      "note": "",
      "origin": "upstream",
      "shape": "shield",
      "type": "government"
    },
    {
      "id": "ERCOT",
      "label": "ERCOT",
      "layer": "power",
      "name": "ERCOT (Texas grid)",
      "note": "",
      "origin": "upstream",
      "shape": "ring",
      "type": "grid_operator"
    },
    {
      "id": "VOLTUS",
      "label": "Voltus",
      "layer": "power",
      "name": "Voltus",
      "note": "",
      "origin": "upstream",
      "shape": "circle",
      "type": "company"
    },
    {
      "id": "AZCC",
      "label": "Arizona Corp. Commission",
      "layer": "policy",
      "name": "Arizona Corporation Commission",
      "note": "",
      "origin": "upstream",
      "shape": "shield",
      "type": "regulator"
    },
    {
      "id": "GAPOWER",
      "label": "Georgia Power",
      "layer": "power",
      "name": "Georgia Power",
      "note": "",
      "origin": "upstream",
      "shape": "ring",
      "type": "utility"
    },
    {
      "id": "TVA",
      "label": "TVA",
      "layer": "power",
      "name": "Tennessee Valley Authority",
      "note": "Federal power utility; offtaker for Kairos Hermes 2.",
      "shape": "square",
      "type": "utility"
    },
    {
      "id": "CFS",
      "label": "CFS",
      "layer": "power",
      "name": "Commonwealth Fusion Systems",
      "note": "Fusion developer; ARC plant planned in Chesterfield County, VA.",
      "shape": "circle",
      "type": "generator"
    },
    {
      "id": "PJM",
      "label": "PJM",
      "layer": "power",
      "name": "PJM Interconnection",
      "note": "Mid-Atlantic/Midwest RTO; runs the capacity auction.",
      "shape": "square",
      "type": "grid_operator"
    },
    {
      "id": "TXLEG",
      "label": "Texas Lege.",
      "layer": "policy",
      "name": "Texas Legislature",
      "note": "Passed SB 6 (89R) on large loads.",
      "shape": "hex",
      "type": "government"
    },
    {
      "id": "PUCT",
      "label": "PUC Texas",
      "layer": "policy",
      "name": "Public Utility Commission of Texas",
      "note": "Directed by SB 6 to set large-load interconnection standards.",
      "shape": "hex",
      "type": "regulator"
    },
    {
      "id": "HOLTEC",
      "label": "Holtec",
      "layer": "power",
      "name": "Holtec International",
      "note": "Owner of Palisades (Covert, MI).",
      "shape": "circle",
      "type": "generator"
    },
    {
      "id": "TSLA",
      "label": "Tesla",
      "layer": "robotics",
      "name": "Tesla, Inc.",
      "note": "Megapack storage maker; Optimus humanoid; robotaxi.",
      "shape": "circle",
      "type": "company"
    }
  ],
  "archive": {
    "built": "2026-11-05",
    "count": 23,
    "items": [
      {
        "date": "2025-06-03",
        "desk": "Energy & Grid",
        "search_text": "Meta signs 20-year PPA for Constellation's Clinton nuclear plant Constellation and Meta signed a 20-year power purchase agreement for 1,121 MW from the Clinton Clean Energy Center (Illinois), starting June 2027, after the state's zero-emission credit program expires. The deal supports relicensing and a 30 MW uprate, and Constellation says it is evaluating whether to extend the site's existing early site permit or seek a new construction permit for an advanced reactor or SMR there. Term, MW, June 2027 start, ZEC expiry, uprate and SMR evaluation. The release does not say which Meta data centers the attributes are matched to. CEG META",
        "summary": "Constellation and Meta signed a 20-year power purchase agreement for 1,121 MW from the Clinton Clean Energy Center (Illinois), starting June 2027, after the state's zero-emission credit program expires. The deal supports relicensing and a 30 MW uprate, and Constellation says it is evaluating whether to extend the site's existing early site permit or seek a new construction permit for an advanced reactor or SMR there.",
        "title": "Meta signs 20-year PPA for Constellation's Clinton nuclear plant",
        "type": "development",
        "url": "#move/ceg-meta-clinton"
      },
      {
        "date": "2025-08-18",
        "desk": "Energy & Grid",
        "search_text": "Google, Kairos and TVA: Hermes 2 to feed TVA's grid for Google's TN/AL data centers Google said Kairos Power's Hermes 2 reactor at Oak Ridge, Tennessee will supply up to 50 MW to TVA's grid under a PPA, targeted to be operating in 2030, with clean-energy attributes going to Google data centers in Montgomery County, TN and Jackson County, AL. Kairos calls it the first deployment under its deal with Google to enable 500 MW of new advanced nuclear capacity by 2035. 50 MW, 2030 target, TVA as utility offtaker, the two data-center counties. Kairos' own description of the three-party arrangement. Hermes 2 still needs NRC licensing milestones before operation; schedule risk is not quantified in the sources. GOOG KAIROS TVA",
        "summary": "Google said Kairos Power's Hermes 2 reactor at Oak Ridge, Tennessee will supply up to 50 MW to TVA's grid under a PPA, targeted to be operating in 2030, with clean-energy attributes going to Google data centers in Montgomery County, TN and Jackson County, AL. Kairos calls it the first deployment under its deal with Google to enable 500 MW of new advanced nuclear capacity by 2035.",
        "title": "Google, Kairos and TVA: Hermes 2 to feed TVA's grid for Google's TN/AL data centers",
        "type": "development",
        "url": "#move/kairos-tva-hermes2"
      },
      {
        "date": "2025-06-30",
        "desk": "Energy & Grid",
        "search_text": "Google agrees to take 200 MW from CFS's first fusion plant and invests again Google signed an investment and offtake agreement with Commonwealth Fusion Systems to take 200 MW from CFS's first commercial ARC plant, to be developed in Chesterfield, Virginia, and made its second capital investment in CFS. Google calls it the largest direct corporate purchase agreement for fusion energy. 200 MW offtake, Chesterfield VA, second capital investment. CFS's description of the strategic partnership. Fusion has not yet delivered commercial electricity to a grid; the timeline depends on unproven steps. GOOG CFS",
        "summary": "Google signed an investment and offtake agreement with Commonwealth Fusion Systems to take 200 MW from CFS's first commercial ARC plant, to be developed in Chesterfield, Virginia, and made its second capital investment in CFS. Google calls it the largest direct corporate purchase agreement for fusion energy.",
        "title": "Google agrees to take 200 MW from CFS's first fusion plant and invests again",
        "type": "development",
        "url": "#move/google-cfs-arc"
      },
      {
        "date": "2025-07-24",
        "desk": "Energy & Grid",
        "search_text": "DOE picks four federal sites for AI data centers and energy, then opens solicitations DOE selected the Idaho National Laboratory, Oak Ridge Reservation, Paducah site and Savannah River Site for AI data center and energy infrastructure development. It issued an RFP for Oak Ridge on Sept 30, 2025 (proposals due Dec 1, 2025) and a Request for Offer for Paducah on Nov 4, 2025. The four sites. Oak Ridge RFP and Dec 1, 2025 deadline. Paducah RFO. Awards and selected developers are not covered; no award has been added to this section. DOE",
        "summary": "DOE selected the Idaho National Laboratory, Oak Ridge Reservation, Paducah site and Savannah River Site for AI data center and energy infrastructure development. It issued an RFP for Oak Ridge on Sept 30, 2025 (proposals due Dec 1, 2025) and a Request for Offer for Paducah on Nov 4, 2025.",
        "title": "DOE picks four federal sites for AI data centers and energy, then opens solicitations",
        "type": "development",
        "url": "#move/doe-federal-sites"
      },
      {
        "date": "2025-12-17",
        "desk": "Energy & Grid",
        "search_text": "PJM 2027/28 capacity auction falls short of the reliability requirement PJM's 2027/2028 Base Residual Auction procured 134,479 MW at $333.44/MW-day (145,777 MW including FRR), 6,623 MW short of the reliability requirement, with cleared supply valued at $16.4B (PJM notes not all load pays the clearing price) and a 14.8% reserve margin. PJM attributes nearly 5,100 MW of the roughly 5,250 MW by which the 2027/2028 peak-load forecast exceeds the one used for the 2026/2027 auction to data center demand. Cleared MW, price, shortfall, reserve margin, cost and data-center share of load growth. The data-center share is PJM's forecast attribution, not metered load. PJM",
        "summary": "PJM's 2027/2028 Base Residual Auction procured 134,479 MW at $333.44/MW-day (145,777 MW including FRR), 6,623 MW short of the reliability requirement, with cleared supply valued at $16.4B (PJM notes not all load pays the clearing price) and a 14.8% reserve margin. PJM attributes nearly 5,100 MW of the roughly 5,250 MW by which the 2027/2028 peak-load forecast exceeds the one used for the 2026/2027 auction to data center demand.",
        "title": "PJM 2027/28 capacity auction falls short of the reliability requirement",
        "type": "development",
        "url": "#move/pjm-bra-2027"
      },
      {
        "date": "2025-06-20",
        "desk": "Energy & Grid",
        "search_text": "Texas SB 6: large-load interconnection, curtailment and cost rules for ERCOT Texas SB 6 (effective June 20, 2025) requires the PUC to set standards for interconnecting large-load customers in the ERCOT region, requires ERCOT notice and study of certain net-metering (co-location) arrangements, requires curtailment protocols for transmission-voltage loads during firm load shed, and requires the PUC to have ERCOT develop a reliability service that competitively procures demand reductions from large loads of at least 75 MW for anticipated emergencies. Effective date and the bill-summary provisions above. The PUC implementing rule (16 TAC §25.194) is not dated here: the adoption document found is unsigned. TXLEG PUCT ERCOT",
        "summary": "Texas SB 6 (effective June 20, 2025) requires the PUC to set standards for interconnecting large-load customers in the ERCOT region, requires ERCOT notice and study of certain net-metering (co-location) arrangements, requires curtailment protocols for transmission-voltage loads during firm load shed, and requires the PUC to have ERCOT develop a reliability service that competitively procures demand reductions from large loads of at least 75 MW for anticipated emergencies.",
        "title": "Texas SB 6: large-load interconnection, curtailment and cost rules for ERCOT",
        "type": "development",
        "url": "#move/texas-sb6"
      },
      {
        "date": "2025-07-24",
        "desk": "Energy & Grid",
        "search_text": "NRC approves Palisades restart licensing actions; Holtec returns plant to operations status The NRC approved licensing and regulatory actions that allow Holtec to load fuel at Palisades (Covert, Michigan), which shut in May 2022; several licensing actions remain under review, and the original operating license would expire March 24, 2031. The NRC also approved the transfer of operating authority to Palisades Energy LLC. Holtec says the plant transitioned from decommissioning to operations status on Aug 25, 2025, and calls it the first nuclear plant in U.S. history to do so. NRC approvals, remaining reviews, license expiry. Aug 25, 2025 transition to operations status. Neither source names an AI offtaker; this move shows grid supply, not a data-center contract. NRC HOLTEC",
        "summary": "The NRC approved licensing and regulatory actions that allow Holtec to load fuel at Palisades (Covert, Michigan), which shut in May 2022; several licensing actions remain under review, and the original operating license would expire March 24, 2031. The NRC also approved the transfer of operating authority to Palisades Energy LLC. Holtec says the plant transitioned from decommissioning to operations status on Aug 25, 2025, and calls it the first nuclear plant in U.S. history to do so.",
        "title": "NRC approves Palisades restart licensing actions; Holtec returns plant to operations status",
        "type": "development",
        "url": "#move/palisades-restart"
      },
      {
        "date": "2026-10-21",
        "desk": "Energy & Grid",
        "search_text": "Tesla: 13.7 GWh of storage in Q3 2026; Megafactory Texas producing Tesla's Q3 2026 Update reports 13.7 GWh of energy storage deployed in the quarter and says Megafactory Texas began production, with planned capacity of 50 GWh. Tesla describes energy storage as critical to data center uptime. Quarterly storage GWh, Megafactory Texas status, data-center framing. Tesla does not name data-center customers or split deployments by customer type. TSLA",
        "summary": "Tesla's Q3 2026 Update reports 13.7 GWh of energy storage deployed in the quarter and says Megafactory Texas began production, with planned capacity of 50 GWh. Tesla describes energy storage as critical to data center uptime.",
        "title": "Tesla: 13.7 GWh of storage in Q3 2026; Megafactory Texas producing",
        "type": "development",
        "url": "#move/tesla-storage-q3-2026"
      },
      {
        "date": "2024-09-20",
        "desk": "Energy & Grid",
        "search_text": "Crane (ex-TMI Unit 1) restart for Microsoft Constellation plans to restart the 835 MW Crane Clean Energy Center, formerly Three Mile Island Unit 1, with Microsoft purchasing its power. In its August 6, 2026 results release, Constellation described a 2027 restart target. The NRC issued its final environmental assessment and finding of no significant impact on September 18; the Federal Register notice followed on September 25. The environmental finding does not authorize a restart. DOE closed a $1B loan to Constellation Energy Generation, LLC on November 18, 2025 to help finance the restart. The original release named the Loan Programs Office; closing does not establish full drawdown or restart authorization. NRC issued the draft EA/FONSI on June 3, 2026. 835 MW, Microsoft offtake, 2028 target. NRC final EA/FONSI published Sep 25, 2026. The U.S. Nuclear Regulatory Commission (NRC), as the lead agency, and the U.S. Department of Energy (DOE) Office of Energy Dominance Financing (EDF), as a cooperating agency, are issuing an environmental assessment (EA) and finding of no significant impact (FONSI) evaluating the reasonably foreseeable environmental effects from proposed Federal actions related to reauthorizing power operations at the Christopher M. Crane Clean Energy Center (CCEC). Specifically, the NRC is considering issuance of an exemption and three license amendments, which were requested by Constellation Energy Generation, LLC (CEG) to support the potential reauthorization of power operations at the CCEC. The DOE EDF's proposed action is a decision on providing Federal financial assistance (a loan guarantee) for refueling and resumption of power operations at the CCEC. LONDONDERRY, PA (Sept 20, 2024) Constellation (Nasdaq: CEG) announced today the signing of a 20-year power purchase agreement with Microsoft that will pave the way for the launch of the Crane Clean Energy Center (CCEC) and restart of Three Mile Island Unit 1, which operated at industry-leading levels of safety and reliability for decades before being shut down for economic reasons exactly five years ago today. Under the agreement, Microsoft will purchase energy from the renewed plant as part of its goal to help match the power its data centers in PJM use with carbon-free energy. LONDONDERRY, PA (Sept 20, 2024) Constellation (Nasdaq: CEG) announced today the signing of a 20-year power purchase agreement with Microsoft that will pave the way for the launch of the Crane Clean Energy Center (CCEC) and restart of Three Mile Island Unit 1, which operated at industry-leading levels of safety and reliability for decades before being shut down for economic reasons exactly five years ago today. Under the agreement, Microsoft will purchase energy from the renewed plant as part of its goal to help match the power its data centers in PJM use with carbon-free energy. - Progress continues at Crane Clean Energy Center paving way for restart: FERC approved our waiver request to transfer CIRs from the dual fuel Eddystone Units 3 and 4 in Pennsylvania to the Crane Clean Energy Center. This decision clears a critical regulatory hurdle for the plant restart, we expect the transfer to expedite its ability to deliver reliable emissions-free power to the grid. Additionally, the NRC has approved a fuel license amendment request for the Crane Clean Energy Center — a major milestone moving us closer to restarting operations in 2027. \n- Helping our customers meet their evolving energy needs: We have signed an additional 920 megawatts (MW) of long-term power purchase agreements (PPA) for clean, reliable nuclear generation with a diverse set of investment grade customers. These agreements are for 15-20 years in duration and are set to begin in 2029 through 2032. Among these PPAs, our 176 MW agreement with Walmart will enable a 30 MW capacity expansion at our Dresden Clean Energy Center in Illinois and facilitate additional investments to strengthen the local community by supporting jobs and enabling continued expansion of operations and workforce. \n- Agreement to divest the Brazos Valley Energy Center: In August 2026, we entered into an agreement with LS Power to divest the Brazos Valley Energy Center (f/k/a Jack A. Fusco Energy Center), a 606 MW natural gas-fired plant in ERCOT for $860 million before closing adjustments, a key step in satisfying regulatory commitments related to our acquisition of Calpine earlier this year. This marks the last asset sale required by our regulatory commitments under the acquisition. Closing of the sale is subject to the receipt of approval by the DOJ, and other customary closing conditions. We expect the transaction to close by the end of this year. \n- License renewal applications for two New York nuclear units: We have filed license renewal applications with the NRC to extend the operations of the Ginna Clean Energy Center and the Nine Mile Point Unit 1 reactor in upstate New York to 2049. If approved, the units' operating licenses would be extended 20 years, to 2049. Nine Mile Point Unit 2 is currently licensed to operate until 2046. \n- Recognized for our culture: For the fourth year in a row we were Certified™ by Great Place to Work®. The designation is based on how our employees rate their experience working at Constellation. In a survey of about 5,000 of our employees, 83% of those who responded said it is a great place to work – about 26 points higher than the average U.S. company. Great Place to Work® is acknowledged worldwide as a global benchmark for workplace culture, employee experience and the leadership behaviors proven to deliver strong market performance, employee retention and increased innovation. For the second year in a row we were recognized as one of the Civic 50® and as the energy sector leader by Points of Light. The Civic 50® is a well-respected standard for corporate social impact, recognizing the most community-minded companies in the U.S. for how they show up through employee volunteerism, community investment and broader social impact efforts. We were recognized as a World's Top Disability Inclusive Business based on our performance on the Disability Index®, the leading benchmark for disability inclusion. This recognition signifies that we're a leading performer in disability inclusion, accessibility and workplace practices. It's also a reflection of our commitment to fostering an environment where all employees can do their best work, advance their careers and feel a true sense of belonging. LONDONDERRY, PA (Sept 20, 2024) Constellation (Nasdaq: CEG) announced today the signing of a 20-year power purchase agreement with Microsoft that will pave the way for the launch of the Crane Clean Energy Center (CCEC) and restart of Three Mile Island Unit 1, which operated at industry-leading levels of safety and reliability for decades before being shut down for economic reasons exactly five years ago today. Under the agreement, Microsoft will purchase energy from the renewed plant as part of its goal to help match the power its data centers in PJM use with carbon-free energy. The CCEC is expected to be online in 2028. November 18, 2025 The $1 billion loan to Constellation Energy Generation, LLC (Constellation) will help finance the Crane Clean Energy Center, an 835 MW plant located on the Susquehanna River in Londonderry Township, Pennsylvania. This announcement marks the first project to receive a concurrent conditional commitment and financial close under the Trump Administration. The loan will partially finance the restart of a reactor which ceased operations in 2019 but was never fully decommissioned. Once restarted, pending U.S. Nuclear Regulatory Commission licensing approvals, | Draft Environmental Assessment and FONSI: The NRC issued a draft EA and draft FONSI (ML26120A058). | June 3, 2026 | U.S. Secretary of Energy Chris Wright today announced the Department of Energy’s (DOE) Loan Programs Office (LPO) closed a loan to lower energy costs and restart a Pennsylvania nuclear power plant. The exact day Constellation moved its restart target from 2028 to 2027 is unknown. Remaining NRC approvals and a return to commercial operation are still pending. CEG MSFT NRC DOE",
        "summary": "Constellation plans to restart the 835 MW Crane Clean Energy Center, formerly Three Mile Island Unit 1, with Microsoft purchasing its power. In its August 6, 2026 results release, Constellation described a 2027 restart target. The NRC issued its final environmental assessment and finding of no significant impact on September 18; the Federal Register notice followed on September 25. The environmental finding does not authorize a restart. DOE closed a $1B loan to Constellation Energy Generation, LLC on November 18, 2025 to help finance the restart. The original release named the Loan Programs Office; closing does not establish full drawdown or restart authorization. NRC issued the draft EA/FONSI on June 3, 2026.",
        "title": "Crane (ex-TMI Unit 1) restart for Microsoft",
        "type": "development",
        "url": "#move/crane-restart"
      },
      {
        "date": "2026-06-18",
        "desk": "Energy & Grid",
        "search_text": "Texas approves ERCOT's Batch Zero for large loads The Public Utility Commission of Texas approved ERCOT’s Batch Zero process for connecting large electricity users. ERCOT’s September 14–15, 2026 board presentation reports that provisional classifications were provided to interconnecting transmission service providers on September 3. The presentation also reports a pause on energizing new large-load data centers and crypto facilities pending eligibility verification, audit and community-impact review. A provisional classification is not final admission or a connected load. Approval and next-step dates. ERCOT has begun a verification and audit of the eligibility of all Large Loads \nprovisionally included in Batch Zero. ERCOT will file the Batch Zero Eligibility \nVerification Report with the Commission by December 10, 2026. \nERCOT will send RFIs to the Interconnecting Transmission Service Providers and \nDistribution Service Providers of both medium Load (25-75 MW) and Large Load \ndata centers and crypto mining facilities to gather certain information regarding the \nimpact of these Loads on their communities. ERCOT will file the Community Impact \nReview Report with the Commission by December 10, 2026. \nERCOT has paused the energization of new Large Load data centers and crypto \nmining facilities until the completion of the verification and audit and community \nimpact review. \nERCOT provided provisional Batch Zero Large Load project classification (base, \nstudied, excluded) to the Interconnecting TSPs on September 3, 2026. Final project \ninclusion/ exclusion determination will be based on the results of the eligibility \nverification and audit and provided in December. (Originally, PGRR 145 required \nERCOT to provide final classification on August 7, 2026.) \nERCOT is still determining the impact to the Batch Zero Study timeline (Originally, \nPGRR 145 required ERCOT to complete the study by April 9. 2027.)  ERCOT has begun a verification and audit of the eligibility of all Large Loads \nprovisionally included in Batch Zero. ERCOT will file the Batch Zero Eligibility \nVerification Report with the Commission by December 10, 2026. \nERCOT will send RFIs to the Interconnecting Transmission Service Providers and \nDistribution Service Providers of both medium Load (25-75 MW) and Large Load \ndata centers and crypto mining facilities to gather certain information regarding the \nimpact of these Loads on their communities. ERCOT will file the Community Impact \nReview Report with the Commission by December 10, 2026. \nERCOT has paused the energization of new Large Load data centers and crypto \nmining facilities until the completion of the verification and audit and community \nimpact review. \nERCOT provided provisional Batch Zero Large Load project classification (base, \nstudied, excluded) to the Interconnecting TSPs on September 3, 2026. Final project \ninclusion/ exclusion determination will be based on the results of the eligibility \nverification and audit and provided in December. (Originally, PGRR 145 required \nERCOT to provide final classification on August 7, 2026.) \nERCOT is still determining the impact to the Batch Zero Study timeline (Originally, \nPGRR 145 required ERCOT to complete the study by April 9. 2027.)   Jun 18, 2026  September 3, 2026 The September presentation reports provisional classifications, not final admission. Its studied-load totals are inconsistent, so the total capacity remains unclear. ERCOT",
        "summary": "The Public Utility Commission of Texas approved ERCOT’s Batch Zero process for connecting large electricity users. ERCOT’s September 14–15, 2026 board presentation reports that provisional classifications were provided to interconnecting transmission service providers on September 3. The presentation also reports a pause on energizing new large-load data centers and crypto facilities pending eligibility verification, audit and community-impact review. A provisional classification is not final admission or a connected load.",
        "title": "Texas approves ERCOT's Batch Zero for large loads",
        "type": "development",
        "url": "#move/ercot-batch-zero"
      },
      {
        "date": "2026-04-16",
        "desk": "Energy & Grid",
        "search_text": "Arizona regulators hold first data-center / large-load workshop and weigh a universal large-load tariff The Arizona Corporation Commission held an initial workshop on large-load and data-center customers on April 16, 2026, in the docket opened in 2025 (E-00000A-25-0069). Per the Commission, participants agreed on the need for new or improved policies so data centers keep paying for new generation and infrastructure, and the Commission discussed a hybrid pathway that could include a universal large-load tariff alongside energy supply agreements. Presenters included Arizona Public Service (APS), Salt River Project (SRP), and Tucson Electric Power/UniSource Electric (TEP/UNSE). Docket E-00000A-25-0069 on rate classifications for data centers opened in April 2025 by then-Chairman Kevin Thompson. Arizona Public Service Company (APS) and Salt River Project (SRP) representatives informed the Commission of the exorbitantly high interest their utilities are receiving from potential large load and data center customers which currently exceed their capacity to serve. Tucson Electric Power (TEP)/Unisource Electric (UNS) Company’s customers include residential and small/medium businesses. Phoenix, Ariz.— The Arizona Corporation Commission hosted an initial workshop concerning the regulatory landscape involving large load and data center customers on Thursday, April 16, 2026. A diverse set of presenters contributed to a sweeping discussion including currently regulatory tools available in Arizona, what other states are doing, consumer and ratepayer protections, the data center perspective, potential independent power producer solutions, embracing free market principles in the digital world, as well as presentations from Arizona’s three largest electric utilities. In addition, the Commission discussed aligning State policy with the Ratepayer Protection Pledge and implementing a hybrid pathway for large load and data center customers, which could include a universal large load tariff along with ESAs that specifically outlines and assigns costs to large load and data center customers. No rule, tariff or deadline was adopted; the page reports discussion and consensus only. APS, SRP and TEP/UNSE presented; the workshop adopted no binding rule or tariff, so no new utility regulatory connection is inferred. Whether the Commission will open a formal rulemaking or order utilities to file tariffs is not stated. AZCC",
        "summary": "The Arizona Corporation Commission held an initial workshop on large-load and data-center customers on April 16, 2026, in the docket opened in 2025 (E-00000A-25-0069). Per the Commission, participants agreed on the need for new or improved policies so data centers keep paying for new generation and infrastructure, and the Commission discussed a hybrid pathway that could include a universal large-load tariff alongside energy supply agreements. Presenters included Arizona Public Service (APS), Salt River Project (SRP), and Tucson Electric Power/UniSource Electric (TEP/UNSE).",
        "title": "Arizona regulators hold first data-center / large-load workshop and weigh a universal large-load tariff",
        "type": "development",
        "url": "#move/azcc-large-load-workshop"
      },
      {
        "date": "",
        "desk": "Energy & Grid",
        "search_text": "FERC participation-office page reports pending large-load response deadlines An educational page from FERC's Office of Public Participation (last updated October 19, 2026) summarizes the six June 18, 2026 FPA Section 206 show-cause dockets (PJM EL26-67-000, SPP EL26-68-000, NYISO EL26-69-000, MISO EL26-70-000, CAISO EL26-71-000, ISO-NE EL26-72-000), noting July 2026 resource-adequacy filings and extended response deadlines of November 16, 2026 for five RTO/ISOs and November 20, 2026 for SPP. These are pending proceedings, not final tariff findings or new operating rules, and the page disclaims reliance for legal purposes. This page was last updated on October 19, 2026 On June 18, 2026, FERC issued six “show cause” orders, pursuant to section 206 of the Federal Power Act, to the regional transmission organizations and independent system operators (RTO/ISOs), as well as the transmission operators in the RTO/ISO regions. The orders led to the opening of six FERC proceedings, also known as “dockets,” with one proceeding for each RTO/ISO region. Through these show cause proceedings, FERC will explore and address how large loads may interconnect efficiently to the transmission system. Show Cause Responses and Answers to Briefing Questions, per Commission letters granting motions to hold proceedings in abeyance for 90 days, are due to FERC by November 16, 2026, for five RTOs/ ISOs and by November 20, 2026, for SPP, with answers due 30 days after. Disclaimer: This is an educational document produced by FERC’s Office of Public Participation (OPP), pursuant to its statutory mission of providing participation support and guidance. This document does not reflect the official views of FERC, any individual Commissioner, or the United States, and you should not rely on it for legal purposes. The Federal Energy Regulatory Commission (FERC) today issued tailored show cause orders under section 206 of the Federal Power Act to each of the six regional grid operators under its jurisdiction, directing them to justify or reform the rules that govern how data centers, manufacturing facilities, and other large energy users connect to the electric grid. PJM Interconnection, LLC (PJM)\tEL26-67-000 Southwest Power Pool, Inc. (SPP)\tEL26-68-000 New York Independent System Operator, Inc. (NYISO)\tEL26-69-000 Midcontinent Independent System Operator, Inc. (MISO)\tEL26-70-000 California Independent System Operator Corporation (CAISO)\tEL26-71-000 ISO New England Inc. (ISO-NE)\tEL26-72-000 The page carries a 'last updated on October 19, 2026' footer stamp rather than an initial publication date. The November 16 and November 20, 2026 response deadlines were still ahead at the snapshot cutoff. FERC RTOS",
        "summary": "An educational page from FERC's Office of Public Participation (last updated October 19, 2026) summarizes the six June 18, 2026 FPA Section 206 show-cause dockets (PJM EL26-67-000, SPP EL26-68-000, NYISO EL26-69-000, MISO EL26-70-000, CAISO EL26-71-000, ISO-NE EL26-72-000), noting July 2026 resource-adequacy filings and extended response deadlines of November 16, 2026 for five RTO/ISOs and November 20, 2026 for SPP. These are pending proceedings, not final tariff findings or new operating rules, and the page disclaims reliance for legal purposes.",
        "title": "FERC participation-office page reports pending large-load response deadlines",
        "type": "development",
        "url": "#move/ferc-large-load-proceeding-status-2026"
      },
      {
        "date": "2026-08-17",
        "desk": "Energy & Grid",
        "search_text": "PORTS-Pike plans phased OpenAI lease with NVIDIA credit support OpenAI reports an agreement for approximately 8 GW-IT at PORTS-Pike, with SB Energy to build, own and operate the campus under a staged 20-year lease. NVIDIA plans a $1.5B SB Energy investment and credit support for initial 4.25 IT-GW buildout. Development depends on infrastructure, permits, environmental reviews and financing; the first 800 MW are expected in 2028, not delivered now. SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver capacity over time. OpenAI will be the customer and will utilize capacity at the site, which will exclusively host NVIDIA AI compute infrastructure. We are contracting for this capacity based on our projected long-term needs for frontier training and growing demand for our products. OpenAI will begin paying only as completed capacity becomes available for lease and will fund those commitments through revenue and cash flow from the significant growth of our business and capital raised from investors. Separately, NVIDIA will invest $1.5 billion in SB Energy and will provide credit support for the land, power, and shell buildout associated with the initial 4.25 IT-GW. Development will depend on the necessary infrastructure, permits, environmental reviews, and financing being in place. The first 800 megawatts are expected to become available in 2028 largely using existing AEP infrastructure. Further development will require new power plants connected to the grid, including natural gas generation, as well as new transmission lines and associated infrastructure. SB Energy has published additional information about the project at portscampus.com⁠(opens in a new window). OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy. We want to develop this project as a partner to Pike County— paying its project-specific energy and infrastructure costs, using water responsibly, creating opportunities for local workers and businesses, and making long-term investments shaped by the community. There is significant work ahead, and the full data center will not be built all at once. SB Energy is developing the project across private land and remediated land controlled by the Department of Energy at the former Portsmouth Gaseous Diffusion Plant. We appreciate the Trump Administration’s leadership in helping advance the redevelopment of this federal site for American AI infrastructure. This gives a site that once supported American industry and national security a new role building infrastructure for the Intelligence Era. August 17, 2026 First 800 MW expected 2028 is not available now. Investment and credit support are prospective; permits, environmental review, infrastructure and financing remain conditions. No inference of full financial close or new-generation delivery. OPENAI SBENERGY NVDA AEP DOE",
        "summary": "OpenAI reports an agreement for approximately 8 GW-IT at PORTS-Pike, with SB Energy to build, own and operate the campus under a staged 20-year lease. NVIDIA plans a $1.5B SB Energy investment and credit support for initial 4.25 IT-GW buildout. Development depends on infrastructure, permits, environmental reviews and financing; the first 800 MW are expected in 2028, not delivered now.",
        "title": "PORTS-Pike plans phased OpenAI lease with NVIDIA credit support",
        "type": "development",
        "url": "#move/ports-pike-financing-plan-2026"
      },
      {
        "date": "2026-10-19",
        "desk": "Energy & Grid",
        "search_text": "Amazon to fund feasibility work for proposed Indiana SMRs X-energy reports a joint development agreement with AEP to advance feasibility for a proposed 960 MW Indiana project, with Amazon providing certain development funding. ROCKVILLE, Md. – October 19, 2026 – X-Energy, Inc. (X-Energy, Inc. (Nasdaq: XE) (“X-energy” or “XE”), a Maryland-based developer of advanced nuclear reactors and fuel technology and American Electric Power (Nasdaq: “AEP”) today announced a Joint Development Agreement (“JDA”) to advance feasibility work for a proposed 960 MW Xe-100 small modular reactor (“SMR”) project in Indiana. Amazon.com, Inc. (Nasdaq: AMZN) (“Amazon”) will provide certain project development funding for the effort, marking the second commercial deployment under X-energy and Amazon’s collaboration aimed at bringing more than 5 GW of new nuclear capacity to the U.S. grid by 2039. October 19, 2026 Milestone-based development funding is not full project finance, permit approval or committed delivery date. XENERGY AEP AMZN",
        "summary": "X-energy reports a joint development agreement with AEP to advance feasibility for a proposed 960 MW Indiana project, with Amazon providing certain development funding.",
        "title": "Amazon to fund feasibility work for proposed Indiana SMRs",
        "type": "development",
        "url": "#move/indiana-xenergy-aep-development-2026"
      },
      {
        "date": "2026-10-22",
        "desk": "Energy & Grid",
        "search_text": "Google and Voltus expand planned virtual power plant to 1 GW Google says an expanded agreement scales its earlier 100 MW virtual-power-plant arrangement to 1 GW across PJM. Today, Google and Voltus announced an expanded agreement to build a 1-gigawatt (GW) virtual power plant across the PJM grid region, which serves 67 million people across 13 states and Washington, D.C. Voltus aggregates flexible capacity from local businesses and homes — like smart thermostats, batteries, and industrial assets — into a Google-funded virtual power plant. During peak demand, these assets temporarily reduce energy use to support grid reliability. In return, participating customers receive direct economic benefits, including bill savings and cash payments. Building on a 100-megawatt agreement from earlier this year, this 10-fold expansion represents one of the largest known distributed capacity portfolios deployed by a hyperscaler to date. Oct 22, 2026 Demand response/aggregated flexible capacity is not 1 GW of new baseload generation. Source does not independently certify full 1 GW already dispatchable. GOOG VOLTUS",
        "summary": "Google says an expanded agreement scales its earlier 100 MW virtual-power-plant arrangement to 1 GW across PJM.",
        "title": "Google and Voltus expand planned virtual power plant to 1 GW",
        "type": "development",
        "url": "#move/google-voltus-vpp-expansion-2026"
      },
      {
        "date": "2026-09-08",
        "desk": "Energy & Grid",
        "search_text": "DOE closes up-to-$1.9B Duane Arnold restart loan NextEra reports combined conditional commitment and financial close on up to $1.9B for the 615 MW restart; DOE independently confirms September closing. The cornerstone of this collaboration is the planned restart of the Duane Arnold Energy Center ( \n\nDuane Arnold\n\n ), \n\nIowa's\n\n only nuclear facility, which is located in \n\nPalo\n\n, near \n\nCedar Rapids\n\n. Once operational, \n\nGoogle\n\n will purchase power from the 615-MW plant as a 24/7 carbon-free energy source to help power \n\nGoogle\n\n's growing cloud and AI infrastructure in \n\nIowa\n\n, while also strengthening local grid reliability, creating thousands of direct and indirect jobs, and driving significant economic investment to the Midwest region. JUNO BEACH, Fla., Sept. 8, 2026 /PRNewswire/ -- NextEra Energy, Inc. (NYSE: NEE) today announced that it and the U.S. Department of Energy (DOE), through its Office of Energy Dominance Financing (EDF), have reached a combined conditional commitment and financial close on a loan of up to $1.9 billion to support the restart of the company's Duane Arnold Energy Center in Iowa. This milestone moves the company closer to restoring Iowa's only nuclear plant and adding reliable, around-the-clock energy to the regional grid. In September 2026, EDF closed on an up to $1.9 billion loan to NextEra Energy that will help finance the restart of the Duane Arnold Energy Center, Iowa’s only nuclear plant, in Linn County, Iowa. Once restarted, pending U.S. Nuclear Regulatory Commission licensing approvals, the nuclear plant will provide reliable baseload power to the Midcontinent Independent System Operator (MISO) grid while supporting growing energy demands in Iowa. The up-to-$1.9B facility is not necessarily fully drawn. NRC licensing remains pending, and Q1 2029 remains a future restart target. The Google power purchase agreement is separate from the DOE loan. NEE DOE GOOG NRC",
        "summary": "NextEra reports combined conditional commitment and financial close on up to $1.9B for the 615 MW restart; DOE independently confirms September closing.",
        "title": "DOE closes up-to-$1.9B Duane Arnold restart loan",
        "type": "development",
        "url": "#move/duane-arnold-doe-loan-close-2026"
      },
      {
        "date": "2026-04-17",
        "desk": "Energy & Grid",
        "search_text": "Kairos reports groundbreaking for Google-linked Hermes 2 Kairos says it broke ground on Hermes 2 in Oak Ridge, its first deployment under its Google reactor-fleet deal; planned output is up to 50 MW to the TVA grid. OAK RIDGE, Tenn. – Today, Kairos Power broke ground on the Hermes 2 Demonstration Plant in Oak Ridge, Tenn. – the company’s first commercial-scale reactor and the first-ever power-producing Gen IV reactor to receive a construction permit from the Nuclear Regulatory Commission (NRC).  Hermes 2 is Kairos Power’s first deployment under its landmark deal with Google to develop an advanced reactor fleet. The plant will supply up to 50 megawatts of clean electricity to the Tennessee Valley Authority (TVA) grid, helping to decarbonize Google data centers in Tennessee and Alabama.  April 17, 2026 Groundbreaking does not establish operating authorization or delivered electricity. Hermes 2 is separate from the Hermes 1 construction project. KAIROS GOOG",
        "summary": "Kairos says it broke ground on Hermes 2 in Oak Ridge, its first deployment under its Google reactor-fleet deal; planned output is up to 50 MW to the TVA grid.",
        "title": "Kairos reports groundbreaking for Google-linked Hermes 2",
        "type": "development",
        "url": "#move/kairos-hermes2-groundbreaking-2026"
      },
      {
        "date": "2026-03-27",
        "desk": "Energy & Grid",
        "search_text": "Entergy and Meta announce larger Louisiana power buildout Entergy announces an additional agreement for Meta’s northeast Louisiana data center, with a planned buildout including seven combined-cycle gas plants totaling more than 5,200 MW and new transmission. RAYVILLE, La. – Entergy Louisiana today announced an additional agreement with Meta to support the hyperscale data center in Northeast Louisiana. Structured to ensure Meta pays its full cost of service, the agreement is expected to deliver approximately $2 billion in customer savings to Entergy Louisiana customers over 20 years, in addition to the $650 million previously announced. Not only are there customer power bill benefits, but also reliability benefits for all customers. To support this project and broader energy system needs, Entergy Louisiana plans a comprehensive buildout of generation, transmission and storage infrastructure, paid for by Meta, including: - Seven new natural gas-fueled combined-cycle power plants totaling more than 5,200 megawatts, with capability for future carbon capture and hydrogen co-firing Mar 27, 2026 Company savings estimates and Meta paying full costs are interested-party claims, not independently verified bill effects. No inference that 2025 approval covers 2026 expansion. Later approval or completed construction not established. ENTERGY META",
        "summary": "Entergy announces an additional agreement for Meta’s northeast Louisiana data center, with a planned buildout including seven combined-cycle gas plants totaling more than 5,200 MW and new transmission.",
        "title": "Entergy and Meta announce larger Louisiana power buildout",
        "type": "development",
        "url": "#move/entergy-meta-expanded-power-plan-2026"
      },
      {
        "date": "2026-11-02",
        "desk": "Energy & Grid",
        "search_text": "OpenAI describes Grid Protectors and a Georgia Power demand-response agreement OpenAI launched Grid Protectors and says its Georgia Power agreement includes up to 1,000 MW of flexible demand response. Separately, OpenAI says it intends its planned Effingham campus to serve as a pilot. The campus is still in development; operation and realized curtailment are not established. Our agreement with Georgia Power also includes up to 1,000 megawatts of flexible demand response, freeing up power to help keep air conditioning running in hundreds of thousands of homes during extreme heat. Although the campus is still in development, we intend for Effingham to serve as a pilot for Grid Protectors, building on an agreement that already provides a model for future campuses. For our planned Effingham County campus, we have committed to pay the full infrastructure and electric-service costs required to serve the project. The arrangements will differ by location, and we will share additional commitments as they are finalized. The agreement’s inception date, activation conditions and demonstrated performance are not established in the source. Up to 1,000 MW is OpenAI’s stated flexible demand-response provision, not delivered generation or demonstrated curtailment. The commitment to pay infrastructure and electric-service costs is OpenAI’s statement; payment and ratepayer outcomes are not independently established. OPENAI GAPOWER",
        "summary": "OpenAI launched Grid Protectors and says its Georgia Power agreement includes up to 1,000 MW of flexible demand response. Separately, OpenAI says it intends its planned Effingham campus to serve as a pilot. The campus is still in development; operation and realized curtailment are not established.",
        "title": "OpenAI describes Grid Protectors and a Georgia Power demand-response agreement",
        "type": "development",
        "url": "#move/openai-grid-protectors-effingham-2026"
      },
      {
        "date": "2026-10-06",
        "desk": "Energy & Grid",
        "search_text": "Google–Constellation: 890 MW nuclear uprates PPA and 2,700 MW PJM supply deal On October 6, 2026, Google and Constellation announced a 20-year PPA supporting 890 MW of planned incremental nuclear uprates at 11 units in Illinois, Pennsylvania and New Jersey, representing more than $4.3B of investment. The first uprate is expected by 2028. Separately, the parties entered a 15-year agreement for 2,700 MW of energy and capacity from existing PJM generation. The 20-year power purchase agreement will enable investments in new equipment and technology at 11 Constellation-owned nuclear units in Illinois, Pennsylvania, and New Jersey, increasing thermal and electrical efficiency to unlock additional reliable, firm power to serve the grid. This capacity is entirely new, expanding total electricity generation available across the PJM footprint. The agreement helps sustain roughly 4,400 existing jobs, creates approximately 7,200 new construction jobs during the building period and represents more than $4.3 billion of new investment by Constellation. Across six nuclear sites in Illinois, Pennsylvania and New Jersey, the agreement helps sustain roughly 4,400 existing jobs, creates approximately 7,200 new construction jobs during the building period and represents more than $4.3 billion of new investment by Constellation. In addition to expanding nuclear generation, the companies entered into a 15-year energy supply agreement for an additional 2,700 MWs in PJM's fleet. This financial structure ensures that Constellation's operating generation assets continue to deliver energy and capacity to the PJM market. first uprate expected to be delivered by 2028. The 890 MW uprates are planned, not operating capacity; the first is expected by 2028. The separate 2,700 MW supply agreement concerns existing PJM generation, not additional generating capacity. Initial supply commencement is not established here. The Google agreement spans six sites in Illinois, Pennsylvania and New Jersey. Exact overlap with DOE’s eight-plant financing portfolio has not been independently reconciled; do not add financing and PPA capacity totals. CEG GOOG",
        "summary": "On October 6, 2026, Google and Constellation announced a 20-year PPA supporting 890 MW of planned incremental nuclear uprates at 11 units in Illinois, Pennsylvania and New Jersey, representing more than $4.3B of investment. The first uprate is expected by 2028. Separately, the parties entered a 15-year agreement for 2,700 MW of energy and capacity from existing PJM generation.",
        "title": "Google–Constellation: 890 MW nuclear uprates PPA and 2,700 MW PJM supply deal",
        "type": "development",
        "url": "#move/constellation-google-pjm-uprates-2026"
      },
      {
        "date": "2026-09-30",
        "desk": "Energy & Grid",
        "search_text": "Constellation–Amazon: 20-year, 690 MW Calvert Cliffs PPA (including 190 MW uprates) Constellation and Amazon announced a 20-year PPA for 690 MW of nuclear power from the Calvert Cliffs Clean Energy Center in Maryland, enabling more than $3B in Constellation investment to modernize the plant and add 190 MW of incremental nuclear uprate capacity expected online between 2030 and 2032. The expansion of Calvert Cliffs' generating capacity will be supported by a 20-year agreement, which includes 690 megawatts of power, including the 190 megawatt uprate. The parties have also entered into a related retail supply agreement to support Amazon operations in the 13-state PJM market. In addition to making the uprate possible, Amazon's long-term commitment will help provide Constellation with the revenue certainty to relicense the plant for another 20 years and make progress toward the development of new clean energy power plants at the site, adding to Maryland’s supply of clean and reliable energy. The agreement will enable more than $3 billion in Maryland infrastructure investment, including state-of-the-art improvements across the entire 1,790-megawatt plant and approximately 190 megawatts in total of new, emissions-free generating capacity coming online between 2030 and 2032. All the electricity generated by Calvert Cliffs will continue flowing to the PJM regional grid just as it does now, demonstrating how large energy users can support investments in new, reliable generation while strengthening the broader electric system. The 190 MW uprate is included within the 690 MW agreement, not additional to it; incremental capacity is targeted for 2030–2032 and remains subject to approvals. Initial delivery date is not established. All output continues to the PJM grid; this is not a dedicated physical wire to Amazon. DOE portfolio overlap does not establish that every MW is identically financed. CEG AMZN",
        "summary": "Constellation and Amazon announced a 20-year PPA for 690 MW of nuclear power from the Calvert Cliffs Clean Energy Center in Maryland, enabling more than $3B in Constellation investment to modernize the plant and add 190 MW of incremental nuclear uprate capacity expected online between 2030 and 2032.",
        "title": "Constellation–Amazon: 20-year, 690 MW Calvert Cliffs PPA (including 190 MW uprates)",
        "type": "development",
        "url": "#move/constellation-amazon-calvert-cliffs-2026"
      },
      {
        "date": "2026-10-27",
        "desk": "Energy & Grid",
        "search_text": "DOE EDF issues up-to-$5B conditional loan commitment for Constellation nuclear uprates The U.S. Department of Energy's Office of Energy Dominance Financing announced a conditional loan commitment of up to $5 billion to Constellation to finance nuclear uprates and modernization adding nearly 1.1 GW across eight nuclear plants in Illinois (Braidwood, Byron, Clinton, Dresden, LaSalle, Quad Cities), Maryland (Calvert Cliffs), and Pennsylvania (Limerick). October 27, 2026 The U.S. Department of Energy’s (DOE) Office of Energy Dominance Financing (EDF) today announced a conditional loan commitment of up to $5 billion to finance nuclear uprates and modernization across Constellation Energy’s nuclear fleet in Illinois, Maryland, and Pennsylvania. The modernization efforts will add nearly 1.1 gigawatts (GW) of electricity, strengthening the grid and lowering costs for millions of Americans across the PJM Interconnection, L.L.C. (PJM) and Midcontinent Independent System Operator (MISO) regions. Constellation’s planned investments at Braidwood, Byron, Clinton, Dresden, LaSalle, and Quad Cities in Illinois; Calvert Cliffs in Maryland; and Limerick in Pennsylvania will produce more electricity from existing nuclear plants, maximizing America’s existing energy infrastructure while supporting growing demand for affordable, reliable, and secure power. EDF’s conditional loan commitment also includes an option to finance future uprate projects at additional Constellation facilities. While this conditional commitment indicates DOE’s intent to provide a loan, Constellation must satisfy certain technical, legal, environmental, and financial conditions before the Department enters into definitive financing documents and funds the loan. This is a conditional loan commitment, not financial close or funds disbursement; Constellation must satisfy technical, legal, environmental, and financial conditions before definitive loan execution. DOE financing does not create a separate additional block of generating capacity. Its portfolio overlaps Constellation uprate activity, but exact MW-by-MW equivalence to the Google, Amazon and Walmart PPAs has not been established; do not add the nearly 1.1 GW financing headline to PPA capacity totals. DOE CEG",
        "summary": "The U.S. Department of Energy's Office of Energy Dominance Financing announced a conditional loan commitment of up to $5 billion to Constellation to finance nuclear uprates and modernization adding nearly 1.1 GW across eight nuclear plants in Illinois (Braidwood, Byron, Clinton, Dresden, LaSalle, Quad Cities), Maryland (Calvert Cliffs), and Pennsylvania (Limerick).",
        "title": "DOE EDF issues up-to-$5B conditional loan commitment for Constellation nuclear uprates",
        "type": "development",
        "url": "#move/doe-constellation-uprates-conditional-loan-2026"
      },
      {
        "title": "OpenAI publishes commitments for future compute campuses",
        "summary": "OpenAI published a National Community Compact for future compute campuses it owns and operates, alongside a policy blueprint. The compact commits to covering electricity and infrastructure costs, financial assurances before major spending, and local reporting. The blueprint proposes rules for compute-campus development.",
        "search_text": "OpenAI publishes commitments for future compute campuses OpenAI published a National Community Compact for future compute campuses it owns and operates, alongside a policy blueprint. The compact commits to covering electricity and infrastructure costs, financial assurances before major spending, and local reporting. The blueprint proposes rules for compute-campus development. OPENAI",
        "type": "development",
        "date": "2026-11-05",
        "url": "#move/openai-community-compact-2026",
        "desk": "energy"
      }
    ]
  },
  "assets": [],
  "changelog": [
    {
      "after": "Texas approves ERCOT's Batch Zero for large loads",
      "before": null,
      "date": "2026-06-18",
      "date_basis": "evidence_date",
      "evidence_date": "2026-06-18",
      "hash": "192718542593786eb54e849d419593b5f430ce4092044bd779b2d1c42ad23448",
      "id": "c030",
      "material": true,
      "materiality_reason": "Legal or regulatory status changed.",
      "move": "ercot-batch-zero",
      "origin": "upstream",
      "relationship": null,
      "section": "ai",
      "source": "s-ercot-b0",
      "type": "rule_final"
    },
    {
      "after": "ERCOT’s September 14–15 board presentation reports provisional classifications provided on September 3, 2026. Separately, it reports a pause on energization of new Large Load data centers and crypto facilities pending eligibility verification, audit and community-impact review. Classification does not establish final admission or delivery.",
      "before": null,
      "date": "2026-09-03",
      "date_basis": "evidence_date",
      "evidence_date": "2026-09-03",
      "hash": "298c0c00b3072f603050ec211f011b89f3d144d98ec4c5ef90b088af01d6855e",
      "id": "c-refresh-ercot-batch-zero-conditional-classification-ercot-batch-zero",
      "material": true,
      "materiality_reason": "September provisional classifications and an energization restriction.",
      "move": "ercot-batch-zero",
      "origin": "upstream",
      "proposal_id": "ercot-batch-zero-conditional-classification",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "ercot-september",
      "type": "evidence_strengthened"
    },
    {
      "after": "OpenAI reports an agreement for approximately 8 GW-IT at PORTS-Pike, with SB Energy to build, own and operate the campus under a staged 20-year lease. NVIDIA plans a $1.5B SB Energy investment and credit support for initial 4.25 IT-GW buildout. Development depends on infrastructure, permits, environmental reviews and financing; the first 800 MW are expected in 2028, not delivered now.",
      "before": null,
      "date": "2026-08-17",
      "date_basis": "evidence_date",
      "evidence_date": "2026-08-17",
      "hash": "faf71f25a0fa8f3657cb8d5695f7f4b6256d88bda6e2c47f3bb7a2d886f81437",
      "id": "c-refresh-ports-pike-financing-plan-2026-ports-pike-financing-plan-2026",
      "material": true,
      "materiality_reason": "Phased campus lease and prospective investment, subject to development conditions.",
      "move": "ports-pike-financing-plan-2026",
      "origin": "upstream",
      "proposal_id": "ports-pike-financing-plan-2026",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "s-openai-pike",
      "type": "evidence_strengthened"
    },
    {
      "after": "X-energy reports a joint development agreement with AEP to advance feasibility for a proposed 960 MW Indiana project, with Amazon providing certain development funding.",
      "before": null,
      "date": "2026-10-19",
      "date_basis": "evidence_date",
      "evidence_date": "2026-10-19",
      "hash": "04ae3e1e92f399fdc00a7211c7a7aac9e4cfc16d264002a26469c8f140a5eb13",
      "id": "c-refresh-indiana-xenergy-aep-development-2026-indiana-xenergy-aep-development-2026",
      "material": true,
      "materiality_reason": "Adds funding scope and feasibility status to existing edges without promoting a proposed reactor into construction or operation.",
      "move": "indiana-xenergy-aep-development-2026",
      "origin": "upstream",
      "proposal_id": "indiana-xenergy-aep-development-2026",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "s-xe-amzn",
      "type": "evidence_strengthened"
    },
    {
      "after": "Google says an expanded agreement scales its earlier 100 MW virtual-power-plant arrangement to 1 GW across PJM.",
      "before": null,
      "date": "2026-10-22",
      "date_basis": "evidence_date",
      "evidence_date": "2026-10-22",
      "hash": "ca49d12ab4add24bd9a48d150e7b98eead97d6391e02ad415695a487b18e6c4b",
      "id": "c-refresh-google-voltus-vpp-expansion-2026-google-voltus-vpp-expansion-2026",
      "material": true,
      "materiality_reason": "Announced demand-response expansion from 100 MW to 1 GW.",
      "move": "google-voltus-vpp-expansion-2026",
      "origin": "upstream",
      "proposal_id": "google-voltus-vpp-expansion-2026",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "s-google-voltus",
      "type": "evidence_strengthened"
    },
    {
      "after": "Kairos says it broke ground on Hermes 2 in Oak Ridge, its first deployment under its Google reactor-fleet deal; planned output is up to 50 MW to the TVA grid.",
      "before": null,
      "date": "2026-04-17",
      "date_basis": "evidence_date",
      "evidence_date": "2026-04-17",
      "hash": "05f2e73a47fe3f67d48678810d19a815d7ebe8b07268ff3f81dcd5b1a20f733a",
      "id": "c-refresh-kairos-hermes2-groundbreaking-2026-kairos-hermes2-groundbreaking-2026",
      "material": true,
      "materiality_reason": "Adds a specific physical build milestone to the older announced power relationship.",
      "move": "kairos-hermes2-groundbreaking-2026",
      "origin": "upstream",
      "proposal_id": "kairos-hermes2-groundbreaking-2026",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "kairos-groundbreaking",
      "type": "evidence_strengthened"
    },
    {
      "after": "Entergy announces an additional agreement for Meta’s northeast Louisiana data center, with a planned buildout including seven combined-cycle gas plants totaling more than 5,200 MW and new transmission.",
      "before": null,
      "date": "2026-03-27",
      "date_basis": "evidence_date",
      "evidence_date": "2026-03-27",
      "hash": "ebd2d12d7eaff9af1ab93d8643eb3ee77b879a83a6db9dda8913fd3031828504",
      "id": "c-refresh-entergy-meta-expanded-power-plan-2026-entergy-meta-expanded-power-plan-2026",
      "material": true,
      "materiality_reason": "Expanded planned generation and transmission; completed construction is unconfirmed.",
      "move": "entergy-meta-expanded-power-plan-2026",
      "origin": "upstream",
      "proposal_id": "entergy-meta-expanded-power-plan-2026",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "meta-entergy-expansion",
      "type": "evidence_strengthened"
    },
    {
      "after": "OpenAI launched Grid Protectors and says its Georgia Power agreement includes up to 1,000 MW of flexible demand response. Separately, OpenAI says it intends its planned Effingham campus to serve as a pilot. The campus is still in development; operation and realized curtailment are not established.",
      "before": null,
      "date": "2026-11-02",
      "date_basis": "evidence_date",
      "evidence_date": "2026-11-02",
      "hash": "ce81a3e9c880a15436421f6518d47d0787e550d11b43191b7d36244035bbdb3d",
      "id": "c-alert-openai-grid-protectors-2026",
      "material": true,
      "materiality_reason": "Adds a named utility agreement and a qualified future campus-flexibility program.",
      "move": "openai-grid-protectors-effingham-2026",
      "origin": "upstream",
      "proposal_id": "openai-grid-protectors-effingham-2026",
      "relationship": "R-GAPOWER-OAI-DR",
      "reported_at": "2026-11-02",
      "section": "ai",
      "source": "openai-grid-protectors-2026",
      "type": "new_promise"
    },
    {
      "after": "Commission announces data-center docket E-00000A-25-0069",
      "before": null,
      "date": "2025-04-10",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "4195b8ddbc1bf2a905650ba6bd84bf0a28d875500ed1bcc64f9b2da2cb50a3ba",
      "id": "c-argon-azcc-large-load-workshop-0",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "azcc-large-load-workshop",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "s-azcc-docket-2025",
      "type": "logged"
    },
    {
      "after": "Initial large-load / data-center workshop held (per Apr 20, 2026 release)",
      "before": null,
      "date": "2026-04-16",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "327369078e76da299c2f4e3f9e654f124a2f285ceb5af56f21da68a5f6175e56",
      "id": "c-argon-azcc-large-load-workshop-1",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "azcc-large-load-workshop",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "s-azcc-workshop-2026",
      "type": "logged"
    },
    {
      "after": "Constellation and Amazon announced a 20-year PPA for 690 MW of nuclear power from the Calvert Cliffs Clean Energy Center in Maryland, enabling more than $3B in Constellation investment to modernize the plant and add 190 MW of incremental nuclear uprate capacity expected online between 2030 and 2032.",
      "before": null,
      "date": "2026-09-30",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "29a6c29835769279b80d94bc51964cb3d8d913e9b084cb7d6e5baa5be6eb54ee",
      "id": "c-argon-constellation-amazon-calvert-cliffs-2026-0",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "constellation-amazon-calvert-cliffs-2026",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "ceg-amazon-calvert-cliffs-2026",
      "type": "logged"
    },
    {
      "after": "On October 6, 2026, Google and Constellation announced a 20-year PPA supporting 890 MW of planned incremental nuclear uprates at 11 units in Illinois, Pennsylvania and New Jersey, representing more than $4.3B of investment. The first uprate is expected by 2028. Separately, the parties entered a 15-year agreement for 2,700 MW of energy and capacity from existing PJM generation.",
      "before": null,
      "date": "2026-10-06",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "aba7822f45892e98a52968db0e50ef8d6cb8f8f76cb9870a4a98e0032bbf9b8d",
      "id": "c-argon-constellation-google-pjm-uprates-2026-0",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "constellation-google-pjm-uprates-2026",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "ceg-google-890mw-2026",
      "type": "logged"
    },
    {
      "after": "Announced",
      "before": null,
      "date": "2024-09-20",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "14fa64179ae53de7a8799e3f48a0f6a9087200446763a7799f310b20026e041c",
      "id": "c-argon-crane-restart-0",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "crane-restart",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "s-ceg-crane",
      "type": "logged"
    },
    {
      "after": "NRC records Amendment 307 approving receipt and possession of new fuel and sealed neutron sources, one limited licensing milestone.",
      "before": null,
      "date": "2026-07-01",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "d7f6ed4f28452daec4ca7eddf16553d63627055324a5985fda232955fb7cd2c8",
      "id": "c-argon-crane-restart-1",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "crane-restart",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "crane-nrc",
      "type": "logged"
    },
    {
      "after": "In its August 6, 2026 results release, Constellation described progress toward restarting Crane in 2027. Its September 2024 announcement had expected 2028. The exact day the target changed is not established, and restart authorization and delivery remain pending.",
      "before": null,
      "date": null,
      "date_basis": "source_report",
      "evidence_date": null,
      "hash": "aeadaec90b7b33712e1b261116756a370114a3d121d63b1c5e26c67ce51d86d6",
      "id": "c-argon-crane-restart-2",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "crane-restart",
      "origin": "upstream",
      "relationship": null,
      "reported_at": "2026-08-06",
      "section": "ai",
      "source": "crane-q2",
      "type": "logged"
    },
    {
      "after": "NRC says it issued the Crane final environmental assessment and FONSI on September 18; the Federal Register notice was published September 25. This is an environmental step, not authorization to resume power operations.",
      "before": null,
      "date": "2026-09-18",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "42881551150db805cc7b3a2da2502b00855786879114e659c6abf0c347ad9395",
      "id": "c-argon-crane-restart-3",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "crane-restart",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "crane-nrc",
      "type": "logged"
    },
    {
      "after": "Federal Register publication of the final EA/FONSI, issued September 18; not restart authorization.",
      "before": null,
      "date": "2026-09-25",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "3e990c0bf7c337743935a6129df9d2a43c6d56c1bb82c5cc92674a2cd429ad9b",
      "id": "c-argon-crane-restart-4",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "crane-restart",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "s-fr-crane",
      "type": "logged"
    },
    {
      "after": "DOE closed a $1B Crane restart loan to Constellation Energy Generation, LLC; not evidence of full drawdown or restart authorization.",
      "before": null,
      "date": "2025-11-18",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "0e00d0f69451a70377e91a480730e896d329d1521e91e5c66142337eb7752b96",
      "id": "c-argon-crane-restart-5",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "crane-restart",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "doe-crane-close-2025",
      "type": "logged"
    },
    {
      "after": "NRC issued the draft environmental assessment and draft FONSI.",
      "before": null,
      "date": "2026-06-03",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "2e171289b57047ba15eff355cafcbd3c3e7489d117f0b706060bce035a5bb1fa",
      "id": "c-argon-crane-restart-6",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "crane-restart",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "crane-nrc",
      "type": "logged"
    },
    {
      "after": "The U.S. Department of Energy's Office of Energy Dominance Financing announced a conditional loan commitment of up to $5 billion to Constellation to finance nuclear uprates and modernization adding nearly 1.1 GW across eight nuclear plants in Illinois (Braidwood, Byron, Clinton, Dresden, LaSalle, Quad Cities), Maryland (Calvert Cliffs), and Pennsylvania (Limerick).",
      "before": null,
      "date": "2026-10-27",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "0e30820ba45facc2d83feaf189999edcb81867fb52b102a8699606086591ef87",
      "id": "c-argon-doe-constellation-uprates-conditional-loan-2026-0",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "doe-constellation-uprates-conditional-loan-2026",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "doe-ceg-5b-conditional-2026",
      "type": "logged"
    },
    {
      "after": "NextEra reports combined conditional commitment and financial close on up to $1.9B for the 615 MW restart; DOE independently confirms September closing.",
      "before": null,
      "date": "2026-09-08",
      "date_basis": "event",
      "evidence_date": null,
      "hash": "da24d3e5a76a1c1c34e1d0150b23c1c8bffffe568b7b0f7a3da41e51b7bd6634",
      "id": "c-argon-duane-arnold-doe-loan-close-2026-0",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "duane-arnold-doe-loan-close-2026",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "duane-close",
      "type": "logged"
    },
    {
      "after": "An educational page from FERC's Office of Public Participation (last updated October 19, 2026) summarizes the six June 18, 2026 FPA Section 206 show-cause dockets (PJM EL26-67-000, SPP EL26-68-000, NYISO EL26-69-000, MISO EL26-70-000, CAISO EL26-71-000, ISO-NE EL26-72-000), noting July 2026 resource-adequacy filings and extended response deadlines of November 16, 2026 for five RTO/ISOs and November 20, 2026 for SPP. These are pending proceedings, not final tariff findings or new operating rules, and the page disclaims reliance for legal purposes.",
      "before": null,
      "date": null,
      "date_basis": "source_report",
      "evidence_date": null,
      "hash": "17e971b54430a84ccf9b2670ad21bf838ad0e1b62905712a7cf5f850a2737d50",
      "id": "c-argon-ferc-large-load-proceeding-status-2026-0",
      "material": true,
      "materiality_reason": "Source-specific reviewed development; an unknown occurrence date remains unknown.",
      "move": "ferc-large-load-proceeding-status-2026",
      "origin": "upstream",
      "relationship": null,
      "reported_at": null,
      "section": "ai",
      "source": "s-ferc-ctcp",
      "type": "logged"
    },
    {
      "after": "Meta signs 20-year PPA for Constellation's Clinton nuclear plant",
      "before": null,
      "date": "2026-11-04",
      "date_basis": "logged",
      "evidence_date": "2025-06-03",
      "id": "ac-ceg-meta-clinton",
      "material": true,
      "materiality_reason": "New to the Atlas seed.",
      "move": "ceg-meta-clinton",
      "relationship": null,
      "section": "energy",
      "source": "a-ceg-meta",
      "type": "added"
    },
    {
      "after": "Google, Kairos and TVA: Hermes 2 to feed TVA's grid for Google's TN/AL data centers",
      "before": null,
      "date": "2026-11-04",
      "date_basis": "logged",
      "evidence_date": "2025-08-18",
      "id": "ac-kairos-tva-hermes2",
      "material": true,
      "materiality_reason": "New to the Atlas seed.",
      "move": "kairos-tva-hermes2",
      "relationship": null,
      "section": "energy",
      "source": "a-goog-kairos-tva",
      "type": "added"
    },
    {
      "after": "Google agrees to take 200 MW from CFS's first fusion plant and invests again",
      "before": null,
      "date": "2026-11-04",
      "date_basis": "logged",
      "evidence_date": "2025-06-30",
      "id": "ac-google-cfs-arc",
      "material": true,
      "materiality_reason": "New to the Atlas seed.",
      "move": "google-cfs-arc",
      "relationship": null,
      "section": "energy",
      "source": "a-goog-cfs",
      "type": "added"
    },
    {
      "after": "DOE picks four federal sites for AI data centers and energy, then opens solicitations",
      "before": null,
      "date": "2026-11-04",
      "date_basis": "logged",
      "evidence_date": "2025-07-24",
      "id": "ac-doe-federal-sites",
      "material": true,
      "materiality_reason": "New to the Atlas seed.",
      "move": "doe-federal-sites",
      "relationship": null,
      "section": "energy",
      "source": "a-doe-sites",
      "type": "added"
    },
    {
      "after": "PJM 2027/28 capacity auction falls short of the reliability requirement",
      "before": null,
      "date": "2026-11-04",
      "date_basis": "logged",
      "evidence_date": "2025-12-17",
      "id": "ac-pjm-bra-2027",
      "material": true,
      "materiality_reason": "New to the Atlas seed.",
      "move": "pjm-bra-2027",
      "relationship": null,
      "section": "energy",
      "source": "a-pjm-bra",
      "type": "added"
    },
    {
      "after": "Texas SB 6: large-load interconnection, curtailment and cost rules for ERCOT",
      "before": null,
      "date": "2026-11-04",
      "date_basis": "logged",
      "evidence_date": "2025-06-20",
      "id": "ac-texas-sb6",
      "material": true,
      "materiality_reason": "New to the Atlas seed.",
      "move": "texas-sb6",
      "relationship": null,
      "section": "energy",
      "source": "a-tx-sb6",
      "type": "added"
    },
    {
      "after": "NRC approves Palisades restart licensing actions; Holtec returns plant to operations status",
      "before": null,
      "date": "2026-11-04",
      "date_basis": "logged",
      "evidence_date": "2025-07-24",
      "id": "ac-palisades-restart",
      "material": true,
      "materiality_reason": "New to the Atlas seed.",
      "move": "palisades-restart",
      "relationship": null,
      "section": "energy",
      "source": "a-nrc-palisades",
      "type": "added"
    },
    {
      "after": "Tesla: 13.7 GWh of storage in Q3 2026; Megafactory Texas producing",
      "before": null,
      "date": "2026-11-04",
      "date_basis": "logged",
      "evidence_date": "2026-10-21",
      "id": "ac-tesla-storage-q3-2026",
      "material": true,
      "materiality_reason": "New to the Atlas seed.",
      "move": "tesla-storage-q3-2026",
      "relationship": null,
      "section": "energy",
      "source": "a-tesla-q3",
      "type": "added"
    },
    {
      "id": "freshness-openai-community-compact-2026",
      "date": "2026-11-05",
      "reported_at": "2026-11-05",
      "date_basis": "source_date",
      "move": "openai-community-compact-2026",
      "relationship": null,
      "type": "logged",
      "material": false,
      "materiality_reason": "Dated primary-source record; no new relationship or delivery promotion.",
      "source": "fresh-source-openai-community-compact-2026",
      "before": null,
      "after": "OpenAI publishes commitments for future compute campuses"
    }
  ],
  "corrections": {
    "items": [],
    "policy": "Private review; no publication corrections log."
  },
  "forecasts": {
    "items": [],
    "object_type": "hn_forecast",
    "scoring": {
      "brier": "mean of (p - outcome)^2 over yes/no resolutions, p = probability/100, outcome 1 if YES else 0; void excluded",
      "hit_rate": "share of yes/no resolutions where the side with >50% happened",
      "min_resolved_to_score": 15
    }
  },
  "layers": [
    {
      "id": "buyers",
      "label": "AI buyers & capital",
      "order": 0,
      "question": ""
    },
    {
      "id": "power",
      "label": "Power & grid",
      "order": 1,
      "question": ""
    },
    {
      "id": "policy",
      "label": "Rules & land",
      "order": 2,
      "question": ""
    },
    {
      "id": "context",
      "label": "Context",
      "order": 3,
      "question": ""
    }
  ],
  "ledger": [],
  "meta": {
    "board_date": "2026-11-05",
    "board_date_note": "Snapshot includes selected dated additions; historical check dates and incomplete coverage remain unchanged.",
    "data_checked": "2026-11-04",
    "publisher": "Hypernovelty Institute",
    "relationship_types": {
      "chips": "supplies accelerators",
      "cloud": "supplies cloud capacity",
      "equity": "holds equity in",
      "fab": "fabricates wafers",
      "finance": "project financing",
      "funds": "funds research by",
      "grid": "grid connection / investment",
      "hosting": "builds / hosts capacity",
      "integration": "integrates its device with",
      "model": "supplies a robot model to",
      "packaging": "packages / tests",
      "power": "sells or routes power to",
      "protocol": "co-develops a commerce protocol with",
      "research_collab": "collaborates on research with",
      "robots": "supplies robots to",
      "rule": "sets rules for",
      "settlement": "provides a settlement asset to",
      "site": "provides site",
      "standard": "supplies the standard used by",
      "trial_site": "hosts a clinical trial for"
    },
    "review_coverage": {
      "complete": false
    },
    "title": "Global Chess Map",
    "topics": [
      {
        "id": "nuclear-fusion",
        "label": "Nuclear & fusion",
        "section": "energy"
      },
      {
        "id": "grid-siting-storage",
        "label": "Grid, siting & storage",
        "section": "energy"
      }
    ]
  },
  "moves": [
    {
      "actors": [
        "CEG",
        "META"
      ],
      "change_my_mind": null,
      "date": "2025-06-03",
      "evidence": [
        {
          "shows": "Term, MW, June 2027 start, ZEC expiry, uprate and SMR evaluation.",
          "source": "a-ceg-meta"
        }
      ],
      "history": [],
      "hn": [],
      "id": "ceg-meta-clinton",
      "kind": "power_deal",
      "position_changes": {
        "basis": [
          "a-ceg-meta"
        ],
        "items": [
          {
            "actor": "META",
            "direction": "+",
            "text": "Secures existing firm nuclear output for 20 years rather than waiting for new build."
          },
          {
            "actor": "CEG",
            "direction": "+",
            "text": "Replaces an expiring state subsidy with a long-dated corporate contract."
          }
        ],
        "label": "Interpretation"
      },
      "promise": {
        "claim": "Clinton output delivered to Meta under a 20-year PPA from June 2027.",
        "claim_source": "a-ceg-meta",
        "current_evidence": [],
        "deadline": "2027-06",
        "delivery_criteria": "Sourced confirmation that delivery under the PPA has begun.",
        "ladder": "announced",
        "outcome": "unclear",
        "outcome_note": "Not yet due."
      },
      "relationships": [
        "R-CEG-META"
      ],
      "section": "energy",
      "status": "published",
      "title": "Meta signs 20-year PPA for Constellation's Clinton nuclear plant",
      "topics": [
        "nuclear-fusion"
      ],
      "uncertain": {
        "items": [
          "The release does not say which Meta data centers the attributes are matched to."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": "2027-06",
          "text": "PPA delivery start."
        }
      ],
      "what_happened": {
        "sources": [
          "a-ceg-meta"
        ],
        "text": "Constellation and Meta signed a 20-year power purchase agreement for 1,121 MW from the Clinton Clean Energy Center (Illinois), starting June 2027, after the state's zero-emission credit program expires. The deal supports relicensing and a 30 MW uprate, and Constellation says it is evaluating whether to extend the site's existing early site permit or seek a new construction permit for an advanced reactor or SMR there."
      }
    },
    {
      "actors": [
        "GOOG",
        "KAIROS",
        "TVA"
      ],
      "change_my_mind": null,
      "date": "2025-08-18",
      "evidence": [
        {
          "shows": "50 MW, 2030 target, TVA as utility offtaker, the two data-center counties.",
          "source": "a-goog-kairos-tva"
        },
        {
          "shows": "Kairos' own description of the three-party arrangement.",
          "source": "a-kairos-tva"
        }
      ],
      "history": [],
      "hn": [],
      "id": "kairos-tva-hermes2",
      "kind": "power_deal",
      "position_changes": {
        "basis": [
          "a-goog-kairos-tva",
          "a-kairos-tva"
        ],
        "items": [
          {
            "actor": "TVA",
            "direction": "+",
            "text": "A federal utility becomes the contracting bridge between a reactor startup and a hyperscaler."
          },
          {
            "actor": "GOOG",
            "direction": "+",
            "text": "First concrete site under the 500 MW Kairos agreement."
          }
        ],
        "label": "Interpretation"
      },
      "promise": {
        "claim": "Hermes 2 operating and supplying up to 50 MW to TVA in 2030.",
        "claim_source": "a-goog-kairos-tva",
        "current_evidence": [],
        "deadline": "2030",
        "delivery_criteria": "Sourced start of commercial operation.",
        "ladder": "announced",
        "outcome": "unclear",
        "outcome_note": "Not yet due."
      },
      "relationships": [
        "R-KAIROS-TVA",
        "R-TVA-GOOG"
      ],
      "section": "energy",
      "status": "published",
      "title": "Google, Kairos and TVA: Hermes 2 to feed TVA's grid for Google's TN/AL data centers",
      "topics": [
        "nuclear-fusion"
      ],
      "uncertain": {
        "items": [
          "Hermes 2 still needs NRC licensing milestones before operation; schedule risk is not quantified in the sources."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": "2030",
          "text": "Hermes 2 operating target."
        }
      ],
      "what_happened": {
        "sources": [
          "a-goog-kairos-tva",
          "a-kairos-tva"
        ],
        "text": "Google said Kairos Power's Hermes 2 reactor at Oak Ridge, Tennessee will supply up to 50 MW to TVA's grid under a PPA, targeted to be operating in 2030, with clean-energy attributes going to Google data centers in Montgomery County, TN and Jackson County, AL. Kairos calls it the first deployment under its deal with Google to enable 500 MW of new advanced nuclear capacity by 2035."
      }
    },
    {
      "actors": [
        "GOOG",
        "CFS"
      ],
      "change_my_mind": null,
      "date": "2025-06-30",
      "evidence": [
        {
          "shows": "200 MW offtake, Chesterfield VA, second capital investment.",
          "source": "a-goog-cfs"
        },
        {
          "shows": "CFS's description of the strategic partnership.",
          "source": "a-cfs-goog"
        }
      ],
      "history": [],
      "hn": [],
      "id": "google-cfs-arc",
      "kind": "power_deal",
      "position_changes": {
        "basis": [
          "a-goog-cfs",
          "a-cfs-goog"
        ],
        "items": [
          {
            "actor": "GOOG",
            "direction": "+",
            "text": "Takes an option on a technology that has not yet produced commercial power — an announcement-rung bet."
          }
        ],
        "label": "Interpretation"
      },
      "promise": {
        "claim": "200 MW from ARC to Google.",
        "claim_source": "a-goog-cfs",
        "current_evidence": [],
        "deadline": null,
        "delivery_criteria": "Sourced commercial operation of ARC and deliveries to Google.",
        "ladder": "announced",
        "outcome": "unclear",
        "outcome_note": "No delivery date is tracked here."
      },
      "relationships": [
        "R-CFS-GOOG",
        "R-GOOG-CFS"
      ],
      "section": "energy",
      "status": "published",
      "title": "Google agrees to take 200 MW from CFS's first fusion plant and invests again",
      "topics": [
        "nuclear-fusion"
      ],
      "uncertain": {
        "items": [
          "Fusion has not yet delivered commercial electricity to a grid; the timeline depends on unproven steps."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": null,
          "text": "ARC construction and licensing milestones."
        }
      ],
      "what_happened": {
        "sources": [
          "a-goog-cfs",
          "a-cfs-goog"
        ],
        "text": "Google signed an investment and offtake agreement with Commonwealth Fusion Systems to take 200 MW from CFS's first commercial ARC plant, to be developed in Chesterfield, Virginia, and made its second capital investment in CFS. Google calls it the largest direct corporate purchase agreement for fusion energy."
      }
    },
    {
      "actors": [
        "DOE"
      ],
      "change_my_mind": null,
      "date": "2025-07-24",
      "evidence": [
        {
          "shows": "The four sites.",
          "source": "a-doe-sites"
        },
        {
          "shows": "Oak Ridge RFP and Dec 1, 2025 deadline.",
          "source": "a-doe-oak"
        },
        {
          "shows": "Paducah RFO.",
          "source": "a-doe-pad"
        }
      ],
      "history": [],
      "hn": [],
      "id": "doe-federal-sites",
      "kind": "policy",
      "position_changes": {
        "basis": [
          "a-doe-sites",
          "a-doe-oak",
          "a-doe-pad"
        ],
        "items": [
          {
            "actor": "DOE",
            "direction": "+",
            "text": "Moves from site lists to live solicitations — land and power become a federal offer."
          }
        ],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "section": "energy",
      "status": "published",
      "title": "DOE picks four federal sites for AI data centers and energy, then opens solicitations",
      "topics": [
        "grid-siting-storage"
      ],
      "uncertain": {
        "items": [
          "Awards and selected developers are not covered; no award has been added to this section."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": null,
          "text": "Selection announcements for Oak Ridge and Paducah."
        }
      ],
      "what_happened": {
        "sources": [
          "a-doe-sites",
          "a-doe-oak",
          "a-doe-pad"
        ],
        "text": "DOE selected the Idaho National Laboratory, Oak Ridge Reservation, Paducah site and Savannah River Site for AI data center and energy infrastructure development. It issued an RFP for Oak Ridge on Sept 30, 2025 (proposals due Dec 1, 2025) and a Request for Offer for Paducah on Nov 4, 2025."
      }
    },
    {
      "actors": [
        "PJM"
      ],
      "change_my_mind": null,
      "date": "2025-12-17",
      "evidence": [
        {
          "shows": "Cleared MW, price, shortfall, reserve margin, cost and data-center share of load growth.",
          "source": "a-pjm-bra"
        }
      ],
      "history": [],
      "hn": [],
      "id": "pjm-bra-2027",
      "kind": "market",
      "position_changes": {
        "basis": [
          "a-pjm-bra"
        ],
        "items": [
          {
            "actor": "PJM",
            "direction": "-",
            "text": "A capacity market that cannot procure its own reliability requirement is a constraint signal for new large loads."
          }
        ],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "section": "energy",
      "status": "published",
      "title": "PJM 2027/28 capacity auction falls short of the reliability requirement",
      "topics": [
        "grid-siting-storage"
      ],
      "uncertain": {
        "items": [
          "The data-center share is PJM's forecast attribution, not metered load."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": null,
          "text": "Next BRA results."
        }
      ],
      "what_happened": {
        "sources": [
          "a-pjm-bra"
        ],
        "text": "PJM's 2027/2028 Base Residual Auction procured 134,479 MW at $333.44/MW-day (145,777 MW including FRR), 6,623 MW short of the reliability requirement, with cleared supply valued at $16.4B (PJM notes not all load pays the clearing price) and a 14.8% reserve margin. PJM attributes nearly 5,100 MW of the roughly 5,250 MW by which the 2027/2028 peak-load forecast exceeds the one used for the 2026/2027 auction to data center demand."
      }
    },
    {
      "actors": [
        "TXLEG",
        "PUCT",
        "ERCOT"
      ],
      "change_my_mind": null,
      "date": "2025-06-20",
      "evidence": [
        {
          "shows": "Effective date and the bill-summary provisions above.",
          "source": "a-tx-sb6"
        }
      ],
      "history": [],
      "hn": [],
      "id": "texas-sb6",
      "kind": "policy",
      "position_changes": {
        "basis": [
          "a-tx-sb6"
        ],
        "items": [
          {
            "actor": "ERCOT",
            "direction": "~",
            "text": "Gains study and curtailment duties over the largest new loads."
          },
          {
            "actor": "PUCT",
            "direction": "~",
            "text": "Must write the large-load interconnection standards."
          }
        ],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [
        "R-TXLEG-PUCT",
        "R-PUCT-ERCOT"
      ],
      "section": "energy",
      "status": "published",
      "title": "Texas SB 6: large-load interconnection, curtailment and cost rules for ERCOT",
      "topics": [
        "grid-siting-storage"
      ],
      "uncertain": {
        "items": [
          "The PUC implementing rule (16 TAC §25.194) is not dated here: the adoption document found is unsigned."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": null,
          "text": "Signed PUC rule and ERCOT protocol changes."
        }
      ],
      "what_happened": {
        "sources": [
          "a-tx-sb6"
        ],
        "text": "Texas SB 6 (effective June 20, 2025) requires the PUC to set standards for interconnecting large-load customers in the ERCOT region, requires ERCOT notice and study of certain net-metering (co-location) arrangements, requires curtailment protocols for transmission-voltage loads during firm load shed, and requires the PUC to have ERCOT develop a reliability service that competitively procures demand reductions from large loads of at least 75 MW for anticipated emergencies."
      }
    },
    {
      "actors": [
        "NRC",
        "HOLTEC"
      ],
      "change_my_mind": null,
      "date": "2025-07-24",
      "evidence": [
        {
          "shows": "NRC approvals, remaining reviews, license expiry.",
          "source": "a-nrc-palisades"
        },
        {
          "shows": "Aug 25, 2025 transition to operations status.",
          "source": "a-holtec-pal"
        }
      ],
      "history": [],
      "hn": [],
      "id": "palisades-restart",
      "kind": "licensing",
      "position_changes": {
        "basis": [
          "a-nrc-palisades",
          "a-holtec-pal"
        ],
        "items": [
          {
            "actor": "HOLTEC",
            "direction": "+",
            "text": "First decommissioning-to-operations reversal — a template other restarts may follow."
          }
        ],
        "label": "Interpretation"
      },
      "promise": {
        "claim": "Palisades returns to power operations.",
        "claim_source": "a-holtec-pal",
        "current_evidence": [],
        "deadline": null,
        "delivery_criteria": "Sourced restart / grid synchronisation.",
        "ladder": "announced",
        "outcome": "unclear",
        "outcome_note": "Operations status and fuel-load authorization reached; a restart or grid synchronisation is not sourced here, so the rung stays at announced (lowered from demonstrated in the v2.1 evidence review)."
      },
      "relationships": [
        "R-NRC-HOLTEC"
      ],
      "section": "energy",
      "status": "published",
      "title": "NRC approves Palisades restart licensing actions; Holtec returns plant to operations status",
      "topics": [
        "nuclear-fusion"
      ],
      "uncertain": {
        "items": [
          "Neither source names an AI offtaker; this move shows grid supply, not a data-center contract."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": null,
          "text": "Restart / grid synchronisation."
        }
      ],
      "what_happened": {
        "sources": [
          "a-nrc-palisades",
          "a-holtec-pal"
        ],
        "text": "The NRC approved licensing and regulatory actions that allow Holtec to load fuel at Palisades (Covert, Michigan), which shut in May 2022; several licensing actions remain under review, and the original operating license would expire March 24, 2031. The NRC also approved the transfer of operating authority to Palisades Energy LLC. Holtec says the plant transitioned from decommissioning to operations status on Aug 25, 2025, and calls it the first nuclear plant in U.S. history to do so."
      }
    },
    {
      "actors": [
        "TSLA"
      ],
      "change_my_mind": null,
      "date": "2026-10-21",
      "evidence": [
        {
          "shows": "Quarterly storage GWh, Megafactory Texas status, data-center framing.",
          "source": "a-tesla-q3"
        }
      ],
      "history": [],
      "hn": [],
      "id": "tesla-storage-q3-2026",
      "kind": "deployment",
      "position_changes": {
        "basis": [
          "a-tesla-q3"
        ],
        "items": [
          {
            "actor": "TSLA",
            "direction": "+",
            "text": "Storage is pitched as data-center infrastructure, not only a utility product."
          }
        ],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "section": "energy",
      "status": "published",
      "title": "Tesla: 13.7 GWh of storage in Q3 2026; Megafactory Texas producing",
      "topics": [
        "grid-siting-storage"
      ],
      "uncertain": {
        "items": [
          "Tesla does not name data-center customers or split deployments by customer type."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": null,
          "text": "Q4 2026 Update storage figures."
        }
      ],
      "what_happened": {
        "sources": [
          "a-tesla-q3"
        ],
        "text": "Tesla's Q3 2026 Update reports 13.7 GWh of energy storage deployed in the quarter and says Megafactory Texas began production, with planned capacity of 50 GWh. Tesla describes energy storage as critical to data center uptime."
      }
    },
    {
      "actors": [
        "CEG",
        "MSFT",
        "NRC",
        "DOE"
      ],
      "change_my_mind": null,
      "date": "2024-09-20",
      "evidence": [
        {
          "shows": "835 MW, Microsoft offtake, 2028 target.",
          "source": "s-ceg-crane"
        },
        {
          "shows": "NRC final EA/FONSI published Sep 25, 2026.",
          "source": "s-fr-crane"
        },
        {
          "shows": "The U.S. Nuclear Regulatory Commission (NRC), as the lead agency, and the U.S. Department of Energy (DOE) Office of Energy Dominance Financing (EDF), as a cooperating agency, are issuing an environmental assessment (EA) and finding of no significant impact (FONSI) evaluating the reasonably foreseeable environmental effects from proposed Federal actions related to reauthorizing power operations at the Christopher M. Crane Clean Energy Center (CCEC). Specifically, the NRC is considering issuance of an exemption and three license amendments, which were requested by Constellation Energy Generation, LLC (CEG) to support the potential reauthorization of power operations at the CCEC. The DOE EDF's proposed action is a decision on providing Federal financial assistance (a loan guarantee) for refueling and resumption of power operations at the CCEC.",
          "source": "s-fr-crane"
        },
        {
          "shows": "LONDONDERRY, PA (Sept 20, 2024) Constellation (Nasdaq: CEG) announced today the signing of a 20-year power purchase agreement with Microsoft that will pave the way for the launch of the Crane Clean Energy Center (CCEC) and restart of Three Mile Island Unit 1, which operated at industry-leading levels of safety and reliability for decades before being shut down for economic reasons exactly five years ago today. Under the agreement, Microsoft will purchase energy from the renewed plant as part of its goal to help match the power its data centers in PJM use with carbon-free energy.",
          "source": "s-ceg-crane"
        },
        {
          "shows": "LONDONDERRY, PA (Sept 20, 2024) Constellation (Nasdaq: CEG) announced today the signing of a 20-year power purchase agreement with Microsoft that will pave the way for the launch of the Crane Clean Energy Center (CCEC) and restart of Three Mile Island Unit 1, which operated at industry-leading levels of safety and reliability for decades before being shut down for economic reasons exactly five years ago today. Under the agreement, Microsoft will purchase energy from the renewed plant as part of its goal to help match the power its data centers in PJM use with carbon-free energy.",
          "source": "s-ceg-crane"
        },
        {
          "shows": "- Progress continues at Crane Clean Energy Center paving way for restart: FERC approved our waiver request to transfer CIRs from the dual fuel Eddystone Units 3 and 4 in Pennsylvania to the Crane Clean Energy Center. This decision clears a critical regulatory hurdle for the plant restart, we expect the transfer to expedite its ability to deliver reliable emissions-free power to the grid. Additionally, the NRC has approved a fuel license amendment request for the Crane Clean Energy Center — a major milestone moving us closer to restarting operations in 2027. \n- Helping our customers meet their evolving energy needs: We have signed an additional 920 megawatts (MW) of long-term power purchase agreements (PPA) for clean, reliable nuclear generation with a diverse set of investment grade customers. These agreements are for 15-20 years in duration and are set to begin in 2029 through 2032. Among these PPAs, our 176 MW agreement with Walmart will enable a 30 MW capacity expansion at our Dresden Clean Energy Center in Illinois and facilitate additional investments to strengthen the local community by supporting jobs and enabling continued expansion of operations and workforce. \n- Agreement to divest the Brazos Valley Energy Center: In August 2026, we entered into an agreement with LS Power to divest the Brazos Valley Energy Center (f/k/a Jack A. Fusco Energy Center), a 606 MW natural gas-fired plant in ERCOT for $860 million before closing adjustments, a key step in satisfying regulatory commitments related to our acquisition of Calpine earlier this year. This marks the last asset sale required by our regulatory commitments under the acquisition. Closing of the sale is subject to the receipt of approval by the DOJ, and other customary closing conditions. We expect the transaction to close by the end of this year. \n- License renewal applications for two New York nuclear units: We have filed license renewal applications with the NRC to extend the operations of the Ginna Clean Energy Center and the Nine Mile Point Unit 1 reactor in upstate New York to 2049. If approved, the units' operating licenses would be extended 20 years, to 2049. Nine Mile Point Unit 2 is currently licensed to operate until 2046. \n- Recognized for our culture: For the fourth year in a row we were Certified™ by Great Place to Work®. The designation is based on how our employees rate their experience working at Constellation. In a survey of about 5,000 of our employees, 83% of those who responded said it is a great place to work – about 26 points higher than the average U.S. company. Great Place to Work® is acknowledged worldwide as a global benchmark for workplace culture, employee experience and the leadership behaviors proven to deliver strong market performance, employee retention and increased innovation. For the second year in a row we were recognized as one of the Civic 50® and as the energy sector leader by Points of Light. The Civic 50® is a well-respected standard for corporate social impact, recognizing the most community-minded companies in the U.S. for how they show up through employee volunteerism, community investment and broader social impact efforts. We were recognized as a World's Top Disability Inclusive Business based on our performance on the Disability Index®, the leading benchmark for disability inclusion. This recognition signifies that we're a leading performer in disability inclusion, accessibility and workplace practices. It's also a reflection of our commitment to fostering an environment where all employees can do their best work, advance their careers and feel a true sense of belonging.",
          "source": "crane-q2"
        },
        {
          "shows": "LONDONDERRY, PA (Sept 20, 2024) Constellation (Nasdaq: CEG) announced today the signing of a 20-year power purchase agreement with Microsoft that will pave the way for the launch of the Crane Clean Energy Center (CCEC) and restart of Three Mile Island Unit 1, which operated at industry-leading levels of safety and reliability for decades before being shut down for economic reasons exactly five years ago today. Under the agreement, Microsoft will purchase energy from the renewed plant as part of its goal to help match the power its data centers in PJM use with carbon-free energy.",
          "source": "s-ceg-crane"
        },
        {
          "shows": "The CCEC is expected to be online in 2028.",
          "source": "s-ceg-crane"
        },
        {
          "shows": "November 18, 2025",
          "source": "doe-crane-close-2025"
        },
        {
          "shows": "The $1 billion loan to Constellation Energy Generation, LLC (Constellation) will help finance the Crane Clean Energy Center, an 835 MW plant located on the Susquehanna River in Londonderry Township, Pennsylvania.",
          "source": "doe-crane-close-2025"
        },
        {
          "shows": "This announcement marks the first project to receive a concurrent conditional commitment and financial close under the Trump Administration. The loan will partially finance the restart of a reactor which ceased operations in 2019 but was never fully decommissioned. Once restarted, pending U.S. Nuclear Regulatory Commission licensing approvals,",
          "source": "doe-crane-close-2025"
        },
        {
          "shows": "| Draft Environmental Assessment and FONSI: The NRC issued a draft EA and draft FONSI (ML26120A058). | June 3, 2026 |",
          "source": "crane-nrc"
        },
        {
          "shows": "U.S. Secretary of Energy Chris Wright today announced the Department of Energy’s (DOE) Loan Programs Office (LPO) closed a loan to lower energy costs and restart a Pennsylvania nuclear power plant.",
          "source": "doe-crane-close-2025"
        }
      ],
      "history": [
        {
          "date": "2024-09-20",
          "event": "Announced",
          "source": "s-ceg-crane"
        },
        {
          "date": "2026-07-01",
          "event": "NRC records Amendment 307 approving receipt and possession of new fuel and sealed neutron sources, one limited licensing milestone.",
          "proposal_id": "crane-fuel-amendment-2026",
          "reported_at": null,
          "source": "crane-nrc"
        },
        {
          "date": null,
          "event": "In its August 6, 2026 results release, Constellation described progress toward restarting Crane in 2027. Its September 2024 announcement had expected 2028. The exact day the target changed is not established, and restart authorization and delivery remain pending.",
          "proposal_id": "crane-2027-target-update",
          "reported_at": "2026-08-06",
          "source": "crane-q2"
        },
        {
          "date": "2026-09-18",
          "event": "NRC says it issued the Crane final environmental assessment and FONSI on September 18; the Federal Register notice was published September 25. This is an environmental step, not authorization to resume power operations.",
          "proposal_id": "crane-final-ea-2026",
          "reported_at": null,
          "source": "crane-nrc"
        },
        {
          "date": "2026-09-25",
          "event": "Federal Register publication of the final EA/FONSI, issued September 18; not restart authorization.",
          "source": "s-fr-crane"
        },
        {
          "date": "2025-11-18",
          "event": "DOE closed a $1B Crane restart loan to Constellation Energy Generation, LLC; not evidence of full drawdown or restart authorization.",
          "source": "doe-crane-close-2025"
        },
        {
          "date": "2026-06-03",
          "event": "NRC issued the draft environmental assessment and draft FONSI.",
          "source": "crane-nrc"
        }
      ],
      "hn": [],
      "id": "crane-restart",
      "kind": "agreement",
      "origin": "upstream",
      "position_changes": {
        "basis": [
          "s-ceg-crane",
          "s-fr-crane"
        ],
        "items": [
          {
            "actor": "MSFT",
            "direction": "+",
            "text": "A named reactor, once restarted, tied to its load."
          },
          {
            "actor": "NRC",
            "direction": "~",
            "text": "Clears an environmental step; licensing decisions remain."
          }
        ],
        "label": "Interpretation"
      },
      "promise": {
        "claim": "Constellation reports a 2027 Crane restart target; delivery and restart authorization remain pending.",
        "claim_source": "crane-q2",
        "current_evidence": [
          "s-fr-crane",
          "crane-q2",
          "s-ceg-crane"
        ],
        "deadline": null,
        "delivery_criteria": "Sourced confirmation of the unit returning to commercial operation.",
        "ladder": "announced",
        "outcome": "unclear",
        "outcome_note": "Company 2027 target, not a dated restart or completed delivery."
      },
      "relationships": [
        "R-CEG-MSFT",
        "R-NRC-CEG",
        "R-DOE-CEG"
      ],
      "section": "ai",
      "title": "Crane (ex-TMI Unit 1) restart for Microsoft",
      "topics": [],
      "uncertain": {
        "items": [
          "The exact day Constellation moved its restart target from 2028 to 2027 is unknown. Remaining NRC approvals and a return to commercial operation are still pending."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": null,
          "text": "Remaining NRC restart approvals and evidence of commercial operation."
        }
      ],
      "what_happened": {
        "sources": [
          "s-ceg-crane",
          "s-fr-crane",
          "crane-nrc",
          "crane-q2",
          "doe-crane-close-2025"
        ],
        "text": "Constellation plans to restart the 835 MW Crane Clean Energy Center, formerly Three Mile Island Unit 1, with Microsoft purchasing its power. In its August 6, 2026 results release, Constellation described a 2027 restart target. The NRC issued its final environmental assessment and finding of no significant impact on September 18; the Federal Register notice followed on September 25. The environmental finding does not authorize a restart. DOE closed a $1B loan to Constellation Energy Generation, LLC on November 18, 2025 to help finance the restart. The original release named the Loan Programs Office; closing does not establish full drawdown or restart authorization. NRC issued the draft EA/FONSI on June 3, 2026."
      }
    },
    {
      "actors": [
        "ERCOT"
      ],
      "change_my_mind": null,
      "date": "2026-06-18",
      "evidence": [
        {
          "shows": "Approval and next-step dates.",
          "source": "s-ercot-b0"
        },
        {
          "shows": "ERCOT has begun a verification and audit of the eligibility of all Large Loads \nprovisionally included in Batch Zero. ERCOT will file the Batch Zero Eligibility \nVerification Report with the Commission by December 10, 2026. \nERCOT will send RFIs to the Interconnecting Transmission Service Providers and \nDistribution Service Providers of both medium Load (25-75 MW) and Large Load \ndata centers and crypto mining facilities to gather certain information regarding the \nimpact of these Loads on their communities. ERCOT will file the Community Impact \nReview Report with the Commission by December 10, 2026. \nERCOT has paused the energization of new Large Load data centers and crypto \nmining facilities until the completion of the verification and audit and community \nimpact review. \nERCOT provided provisional Batch Zero Large Load project classification (base, \nstudied, excluded) to the Interconnecting TSPs on September 3, 2026. Final project \ninclusion/ exclusion determination will be based on the results of the eligibility \nverification and audit and provided in December. (Originally, PGRR 145 required \nERCOT to provide final classification on August 7, 2026.) \nERCOT is still determining the impact to the Batch Zero Study timeline (Originally, \nPGRR 145 required ERCOT to complete the study by April 9. 2027.) ",
          "source": "ercot-september"
        },
        {
          "shows": "ERCOT has begun a verification and audit of the eligibility of all Large Loads \nprovisionally included in Batch Zero. ERCOT will file the Batch Zero Eligibility \nVerification Report with the Commission by December 10, 2026. \nERCOT will send RFIs to the Interconnecting Transmission Service Providers and \nDistribution Service Providers of both medium Load (25-75 MW) and Large Load \ndata centers and crypto mining facilities to gather certain information regarding the \nimpact of these Loads on their communities. ERCOT will file the Community Impact \nReview Report with the Commission by December 10, 2026. \nERCOT has paused the energization of new Large Load data centers and crypto \nmining facilities until the completion of the verification and audit and community \nimpact review. \nERCOT provided provisional Batch Zero Large Load project classification (base, \nstudied, excluded) to the Interconnecting TSPs on September 3, 2026. Final project \ninclusion/ exclusion determination will be based on the results of the eligibility \nverification and audit and provided in December. (Originally, PGRR 145 required \nERCOT to provide final classification on August 7, 2026.) \nERCOT is still determining the impact to the Batch Zero Study timeline (Originally, \nPGRR 145 required ERCOT to complete the study by April 9. 2027.) ",
          "source": "ercot-september"
        },
        {
          "shows": " Jun 18, 2026 ",
          "source": "s-ercot-b0"
        },
        {
          "shows": "September 3, 2026",
          "source": "ercot-september"
        }
      ],
      "history": [
        {
          "date": "2026-09-03",
          "event": "ERCOT’s September 14–15 board presentation reports provisional classifications provided on September 3, 2026. Separately, it reports a pause on energization of new Large Load data centers and crypto facilities pending eligibility verification, audit and community-impact review. Classification does not establish final admission or delivery.",
          "proposal_id": "ercot-batch-zero-conditional-classification",
          "reported_at": null,
          "source": "ercot-september"
        }
      ],
      "hn": [
        "hn-receipt"
      ],
      "id": "ercot-batch-zero",
      "kind": "rule",
      "origin": "upstream",
      "position_changes": {
        "basis": [
          "s-ercot-b0"
        ],
        "items": [
          {
            "actor": "ERCOT",
            "direction": "~",
            "text": "Moves from first-come queueing to batch studies for large loads."
          }
        ],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "section": "ai",
      "title": "Texas approves ERCOT's Batch Zero for large loads",
      "topics": [],
      "uncertain": {
        "items": [
          "The September presentation reports provisional classifications, not final admission. Its studied-load totals are inconsistent, so the total capacity remains unclear."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": null,
          "text": "Verification, audit and community-impact review; no energization inferred from a conditional classification."
        }
      ],
      "what_happened": {
        "sources": [
          "s-ercot-b0",
          "ercot-september"
        ],
        "text": "The Public Utility Commission of Texas approved ERCOT’s Batch Zero process for connecting large electricity users. ERCOT’s September 14–15, 2026 board presentation reports that provisional classifications were provided to interconnecting transmission service providers on September 3. The presentation also reports a pause on energizing new large-load data centers and crypto facilities pending eligibility verification, audit and community-impact review. A provisional classification is not final admission or a connected load."
      }
    },
    {
      "actors": [
        "AZCC"
      ],
      "change_my_mind": null,
      "date": "2026-04-16",
      "evidence": [
        {
          "shows": "Docket E-00000A-25-0069 on rate classifications for data centers opened in April 2025 by then-Chairman Kevin Thompson.",
          "source": "s-azcc-docket-2025"
        },
        {
          "shows": "Arizona Public Service Company (APS) and Salt River Project (SRP) representatives informed the Commission of the exorbitantly high interest their utilities are receiving from potential large load and data center customers which currently exceed their capacity to serve.",
          "source": "s-azcc-workshop-2026"
        },
        {
          "shows": "Tucson Electric Power (TEP)/Unisource Electric (UNS) Company’s customers include residential and small/medium businesses.",
          "source": "s-azcc-workshop-2026"
        },
        {
          "shows": "Phoenix, Ariz.— The Arizona Corporation Commission hosted an initial workshop concerning the regulatory landscape involving large load and data center customers on Thursday, April 16, 2026. A diverse set of presenters contributed to a sweeping discussion including currently regulatory tools available in Arizona, what other states are doing, consumer and ratepayer protections, the data center perspective, potential independent power producer solutions, embracing free market principles in the digital world, as well as presentations from Arizona’s three largest electric utilities.",
          "source": "s-azcc-workshop-2026"
        },
        {
          "shows": "In addition, the Commission discussed aligning State policy with the Ratepayer Protection Pledge and implementing a hybrid pathway for large load and data center customers, which could include a universal large load tariff along with ESAs that specifically outlines and assigns costs to large load and data center customers.",
          "source": "s-azcc-workshop-2026"
        }
      ],
      "history": [
        {
          "date": "2025-04-10",
          "event": "Commission announces data-center docket E-00000A-25-0069",
          "source": "s-azcc-docket-2025"
        },
        {
          "date": "2026-04-16",
          "event": "Initial large-load / data-center workshop held (per Apr 20, 2026 release)",
          "source": "s-azcc-workshop-2026"
        }
      ],
      "hn": [],
      "id": "azcc-large-load-workshop",
      "kind": "rule",
      "origin": "upstream",
      "position_changes": {
        "basis": [
          "s-azcc-workshop-2026"
        ],
        "items": [
          {
            "actor": "AZCC",
            "direction": "+",
            "text": "Moves from case-by-case energy supply agreements toward a possible statewide large-load tariff, but has decided nothing yet."
          }
        ],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "section": "ai",
      "title": "Arizona regulators hold first data-center / large-load workshop and weigh a universal large-load tariff",
      "topics": [],
      "uncertain": {
        "items": [
          "No rule, tariff or deadline was adopted; the page reports discussion and consensus only.",
          "APS, SRP and TEP/UNSE presented; the workshop adopted no binding rule or tariff, so no new utility regulatory connection is inferred.",
          "Whether the Commission will open a formal rulemaking or order utilities to file tariffs is not stated."
        ],
        "label": "Interpretation"
      },
      "watch_next": [
        {
          "date": null,
          "text": "A Commission order or rulemaking in Docket E-00000A-25-0069 directing a large-load tariff."
        }
      ],
      "what_happened": {
        "sources": [
          "s-azcc-workshop-2026",
          "s-azcc-docket-2025"
        ],
        "text": "The Arizona Corporation Commission held an initial workshop on large-load and data-center customers on April 16, 2026, in the docket opened in 2025 (E-00000A-25-0069). Per the Commission, participants agreed on the need for new or improved policies so data centers keep paying for new generation and infrastructure, and the Commission discussed a hybrid pathway that could include a universal large-load tariff alongside energy supply agreements. Presenters included Arizona Public Service (APS), Salt River Project (SRP), and Tucson Electric Power/UniSource Electric (TEP/UNSE)."
      }
    },
    {
      "actors": [
        "FERC",
        "RTOS"
      ],
      "change_my_mind": null,
      "date": null,
      "evidence": [
        {
          "shows": "This page was last updated on October 19, 2026",
          "source": "s-ferc-ctcp"
        },
        {
          "shows": "On June 18, 2026, FERC issued six “show cause” orders, pursuant to section 206 of the Federal Power Act, to the regional transmission organizations and independent system operators (RTO/ISOs), as well as the transmission operators in the RTO/ISO regions. The orders led to the opening of six FERC proceedings, also known as “dockets,” with one proceeding for each RTO/ISO region. Through these show cause proceedings, FERC will explore and address how large loads may interconnect efficiently to the transmission system.",
          "source": "s-ferc-ctcp"
        },
        {
          "shows": "Show Cause Responses and Answers to Briefing Questions, per Commission letters granting motions to hold proceedings in abeyance for 90 days, are due to FERC by November 16, 2026, for five RTOs/ ISOs and by November 20, 2026, for SPP, with answers due 30 days after.",
          "source": "s-ferc-ctcp"
        },
        {
          "shows": "Disclaimer: This is an educational document produced by FERC’s Office of Public Participation (OPP), pursuant to its statutory mission of providing participation support and guidance. This document does not reflect the official views of FERC, any individual Commissioner, or the United States, and you should not rely on it for legal purposes.",
          "source": "s-ferc-ctcp"
        },
        {
          "shows": "The Federal Energy Regulatory Commission (FERC) today issued tailored show cause orders under section 206 of the Federal Power Act to each of the six regional grid operators under its jurisdiction, directing them to justify or reform the rules that govern how data centers, manufacturing facilities, and other large energy users connect to the electric grid.",
          "source": "s-ferc-showcause"
        },
        {
          "shows": "PJM Interconnection, LLC (PJM)\tEL26-67-000",
          "source": "s-ferc-ctcp"
        },
        {
          "shows": "Southwest Power Pool, Inc. (SPP)\tEL26-68-000",
          "source": "s-ferc-ctcp"
        },
        {
          "shows": "New York Independent System Operator, Inc. (NYISO)\tEL26-69-000",
          "source": "s-ferc-ctcp"
        },
        {
          "shows": "Midcontinent Independent System Operator, Inc. (MISO)\tEL26-70-000",
          "source": "s-ferc-ctcp"
        },
        {
          "shows": "California Independent System Operator Corporation (CAISO)\tEL26-71-000",
          "source": "s-ferc-ctcp"
        },
        {
          "shows": "ISO New England Inc. (ISO-NE)\tEL26-72-000",
          "source": "s-ferc-ctcp"
        }
      ],
      "history": [
        {
          "date": null,
          "event": "An educational page from FERC's Office of Public Participation (last updated October 19, 2026) summarizes the six June 18, 2026 FPA Section 206 show-cause dockets (PJM EL26-67-000, SPP EL26-68-000, NYISO EL26-69-000, MISO EL26-70-000, CAISO EL26-71-000, ISO-NE EL26-72-000), noting July 2026 resource-adequacy filings and extended response deadlines of November 16, 2026 for five RTO/ISOs and November 20, 2026 for SPP. These are pending proceedings, not final tariff findings or new operating rules, and the page disclaims reliance for legal purposes.",
          "proposal_id": "ferc-large-load-proceeding-status-2026",
          "reported_at": null,
          "source": "s-ferc-ctcp"
        }
      ],
      "hn": [],
      "id": "ferc-large-load-proceeding-status-2026",
      "kind": "agreement",
      "origin": "upstream",
      "original_announcement_date": null,
      "position_changes": {
        "basis": [
          "s-ferc-ctcp"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [
        "R-FERC-RTOS"
      ],
      "reported_at": null,
      "section": "ai",
      "title": "FERC participation-office page reports pending large-load response deadlines",
      "topics": [],
      "uncertain": {
        "items": [
          "The page carries a 'last updated on October 19, 2026' footer stamp rather than an initial publication date. The November 16 and November 20, 2026 response deadlines were still ahead at the snapshot cutoff."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "s-ferc-ctcp",
          "s-ferc-showcause"
        ],
        "text": "An educational page from FERC's Office of Public Participation (last updated October 19, 2026) summarizes the six June 18, 2026 FPA Section 206 show-cause dockets (PJM EL26-67-000, SPP EL26-68-000, NYISO EL26-69-000, MISO EL26-70-000, CAISO EL26-71-000, ISO-NE EL26-72-000), noting July 2026 resource-adequacy filings and extended response deadlines of November 16, 2026 for five RTO/ISOs and November 20, 2026 for SPP. These are pending proceedings, not final tariff findings or new operating rules, and the page disclaims reliance for legal purposes."
      }
    },
    {
      "actors": [
        "OPENAI",
        "SBENERGY",
        "NVDA",
        "AEP",
        "DOE"
      ],
      "change_my_mind": null,
      "date": "2026-08-17",
      "evidence": [
        {
          "shows": "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver capacity over time. OpenAI will be the customer and will utilize capacity at the site, which will exclusively host NVIDIA AI compute infrastructure. We are contracting for this capacity based on our projected long-term needs for frontier training and growing demand for our products. OpenAI will begin paying only as completed capacity becomes available for lease and will fund those commitments through revenue and cash flow from the significant growth of our business and capital raised from investors. Separately, NVIDIA will invest $1.5 billion in SB Energy and will provide credit support for the land, power, and shell buildout associated with the initial 4.25 IT-GW. Development will depend on the necessary infrastructure, permits, environmental reviews, and financing being in place.",
          "source": "s-openai-pike"
        },
        {
          "shows": "The first 800 megawatts are expected to become available in 2028 largely using existing AEP infrastructure. Further development will require new power plants connected to the grid, including natural gas generation, as well as new transmission lines and associated infrastructure. SB Energy has published additional information about the project at portscampus.com⁠(opens in a new window).",
          "source": "s-openai-pike"
        },
        {
          "shows": "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy. We want to develop this project as a partner to Pike County— paying its project-specific energy and infrastructure costs, using water responsibly, creating opportunities for local workers and businesses, and making long-term investments shaped by the community.",
          "source": "s-openai-pike"
        },
        {
          "shows": "There is significant work ahead, and the full data center will not be built all at once. SB Energy is developing the project across private land and remediated land controlled by the Department of Energy at the former Portsmouth Gaseous Diffusion Plant. We appreciate the Trump Administration’s leadership in helping advance the redevelopment of this federal site for American AI infrastructure. This gives a site that once supported American industry and national security a new role building infrastructure for the Intelligence Era.",
          "source": "s-openai-pike"
        },
        {
          "shows": "August 17, 2026",
          "source": "s-openai-pike"
        }
      ],
      "history": [
        {
          "date": "2026-08-17",
          "event": "OpenAI reports an agreement for approximately 8 GW-IT at PORTS-Pike, with SB Energy to build, own and operate the campus under a staged 20-year lease. NVIDIA plans a $1.5B SB Energy investment and credit support for initial 4.25 IT-GW buildout. Development depends on infrastructure, permits, environmental reviews and financing; the first 800 MW are expected in 2028, not delivered now.",
          "proposal_id": "ports-pike-financing-plan-2026",
          "reported_at": null,
          "source": "s-openai-pike"
        }
      ],
      "hn": [],
      "id": "ports-pike-financing-plan-2026",
      "kind": "agreement",
      "origin": "upstream",
      "original_announcement_date": null,
      "position_changes": {
        "basis": [
          "s-openai-pike"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "reported_at": null,
      "section": "ai",
      "title": "PORTS-Pike plans phased OpenAI lease with NVIDIA credit support",
      "topics": [],
      "uncertain": {
        "items": [
          "First 800 MW expected 2028 is not available now. Investment and credit support are prospective; permits, environmental review, infrastructure and financing remain conditions. No inference of full financial close or new-generation delivery."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "s-openai-pike"
        ],
        "text": "OpenAI reports an agreement for approximately 8 GW-IT at PORTS-Pike, with SB Energy to build, own and operate the campus under a staged 20-year lease. NVIDIA plans a $1.5B SB Energy investment and credit support for initial 4.25 IT-GW buildout. Development depends on infrastructure, permits, environmental reviews and financing; the first 800 MW are expected in 2028, not delivered now."
      }
    },
    {
      "actors": [
        "XENERGY",
        "AEP",
        "AMZN"
      ],
      "change_my_mind": null,
      "date": "2026-10-19",
      "evidence": [
        {
          "shows": "ROCKVILLE, Md. – October 19, 2026 – X-Energy, Inc. (X-Energy, Inc. (Nasdaq: XE) (“X-energy” or “XE”), a Maryland-based developer of advanced nuclear reactors and fuel technology and American Electric Power (Nasdaq: “AEP”) today announced a Joint Development Agreement (“JDA”) to advance feasibility work for a proposed 960 MW Xe-100 small modular reactor (“SMR”) project in Indiana. Amazon.com, Inc. (Nasdaq: AMZN) (“Amazon”) will provide certain project development funding for the effort, marking the second commercial deployment under X-energy and Amazon’s collaboration aimed at bringing more than 5 GW of new nuclear capacity to the U.S. grid by 2039.",
          "source": "s-xe-amzn"
        },
        {
          "shows": "October 19, 2026",
          "source": "s-xe-amzn"
        }
      ],
      "history": [
        {
          "date": "2026-10-19",
          "event": "X-energy reports a joint development agreement with AEP to advance feasibility for a proposed 960 MW Indiana project, with Amazon providing certain development funding.",
          "proposal_id": "indiana-xenergy-aep-development-2026",
          "reported_at": null,
          "source": "s-xe-amzn"
        }
      ],
      "hn": [],
      "id": "indiana-xenergy-aep-development-2026",
      "kind": "agreement",
      "origin": "upstream",
      "original_announcement_date": null,
      "position_changes": {
        "basis": [
          "s-xe-amzn"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "reported_at": null,
      "section": "ai",
      "title": "Amazon to fund feasibility work for proposed Indiana SMRs",
      "topics": [],
      "uncertain": {
        "items": [
          "Milestone-based development funding is not full project finance, permit approval or committed delivery date."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "s-xe-amzn"
        ],
        "text": "X-energy reports a joint development agreement with AEP to advance feasibility for a proposed 960 MW Indiana project, with Amazon providing certain development funding."
      }
    },
    {
      "actors": [
        "GOOG",
        "VOLTUS"
      ],
      "change_my_mind": null,
      "date": "2026-10-22",
      "evidence": [
        {
          "shows": "Today, Google and Voltus announced an expanded agreement to build a 1-gigawatt (GW) virtual power plant across the PJM grid region, which serves 67 million people across 13 states and Washington, D.C.",
          "source": "s-google-voltus"
        },
        {
          "shows": "Voltus aggregates flexible capacity from local businesses and homes — like smart thermostats, batteries, and industrial assets — into a Google-funded virtual power plant. During peak demand, these assets temporarily reduce energy use to support grid reliability. In return, participating customers receive direct economic benefits, including bill savings and cash payments.",
          "source": "s-google-voltus"
        },
        {
          "shows": "Building on a 100-megawatt agreement from earlier this year, this 10-fold expansion represents one of the largest known distributed capacity portfolios deployed by a hyperscaler to date.",
          "source": "s-google-voltus"
        },
        {
          "shows": "Oct 22, 2026",
          "source": "s-google-voltus"
        }
      ],
      "history": [
        {
          "date": "2026-10-22",
          "event": "Google says an expanded agreement scales its earlier 100 MW virtual-power-plant arrangement to 1 GW across PJM.",
          "proposal_id": "google-voltus-vpp-expansion-2026",
          "reported_at": null,
          "source": "s-google-voltus"
        }
      ],
      "hn": [],
      "id": "google-voltus-vpp-expansion-2026",
      "kind": "agreement",
      "origin": "upstream",
      "original_announcement_date": null,
      "position_changes": {
        "basis": [
          "s-google-voltus"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "reported_at": null,
      "section": "ai",
      "title": "Google and Voltus expand planned virtual power plant to 1 GW",
      "topics": [],
      "uncertain": {
        "items": [
          "Demand response/aggregated flexible capacity is not 1 GW of new baseload generation. Source does not independently certify full 1 GW already dispatchable."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "s-google-voltus"
        ],
        "text": "Google says an expanded agreement scales its earlier 100 MW virtual-power-plant arrangement to 1 GW across PJM."
      }
    },
    {
      "actors": [
        "NEE",
        "DOE",
        "GOOG",
        "NRC"
      ],
      "change_my_mind": null,
      "date": "2026-09-08",
      "evidence": [
        {
          "shows": "The cornerstone of this collaboration is the planned restart of the Duane Arnold Energy Center ( \n\nDuane Arnold\n\n ), \n\nIowa's\n\n only nuclear facility, which is located in \n\nPalo\n\n, near \n\nCedar Rapids\n\n. Once operational, \n\nGoogle\n\n will purchase power from the 615-MW plant as a 24/7 carbon-free energy source to help power \n\nGoogle\n\n's growing cloud and AI infrastructure in \n\nIowa\n\n, while also strengthening local grid reliability, creating thousands of direct and indirect jobs, and driving significant economic investment to the Midwest region.",
          "source": "s-nee-google"
        },
        {
          "shows": "JUNO BEACH, Fla., Sept. 8, 2026 /PRNewswire/ -- NextEra Energy, Inc. (NYSE: NEE) today announced that it and the U.S. Department of Energy (DOE), through its Office of Energy Dominance Financing (EDF), have reached a combined conditional commitment and financial close on a loan of up to $1.9 billion to support the restart of the company's Duane Arnold Energy Center in Iowa. This milestone moves the company closer to restoring Iowa's only nuclear plant and adding reliable, around-the-clock energy to the regional grid.",
          "source": "duane-close"
        },
        {
          "shows": "In September 2026, EDF closed on an up to $1.9 billion loan to NextEra Energy that will help finance the restart of the Duane Arnold Energy Center, Iowa’s only nuclear plant, in Linn County, Iowa. Once restarted, pending U.S. Nuclear Regulatory Commission licensing approvals, the nuclear plant will provide reliable baseload power to the Midcontinent Independent System Operator (MISO) grid while supporting growing energy demands in Iowa.",
          "source": "duane-doe"
        }
      ],
      "history": [
        {
          "date": "2026-09-08",
          "event": "NextEra reports combined conditional commitment and financial close on up to $1.9B for the 615 MW restart; DOE independently confirms September closing.",
          "proposal_id": "duane-arnold-doe-loan-close-2026",
          "reported_at": null,
          "source": "duane-close"
        }
      ],
      "hn": [],
      "id": "duane-arnold-doe-loan-close-2026",
      "kind": "agreement",
      "origin": "upstream",
      "original_announcement_date": "2025-10-27",
      "position_changes": {
        "basis": [
          "duane-close",
          "duane-doe",
          "s-nee-google"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "reported_at": null,
      "section": "ai",
      "title": "DOE closes up-to-$1.9B Duane Arnold restart loan",
      "topics": [],
      "uncertain": {
        "items": [
          "The up-to-$1.9B facility is not necessarily fully drawn. NRC licensing remains pending, and Q1 2029 remains a future restart target. The Google power purchase agreement is separate from the DOE loan."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "duane-close",
          "duane-doe",
          "s-nee-google"
        ],
        "text": "NextEra reports combined conditional commitment and financial close on up to $1.9B for the 615 MW restart; DOE independently confirms September closing."
      }
    },
    {
      "actors": [
        "KAIROS",
        "GOOG"
      ],
      "change_my_mind": null,
      "date": "2026-04-17",
      "evidence": [
        {
          "shows": "OAK RIDGE, Tenn. – Today, Kairos Power broke ground on the Hermes 2 Demonstration Plant in Oak Ridge, Tenn. – the company’s first commercial-scale reactor and the first-ever power-producing Gen IV reactor to receive a construction permit from the Nuclear Regulatory Commission (NRC). ",
          "source": "kairos-groundbreaking"
        },
        {
          "shows": "Hermes 2 is Kairos Power’s first deployment under its landmark deal with Google to develop an advanced reactor fleet. The plant will supply up to 50 megawatts of clean electricity to the Tennessee Valley Authority (TVA) grid, helping to decarbonize Google data centers in Tennessee and Alabama. ",
          "source": "kairos-groundbreaking"
        },
        {
          "shows": "April 17, 2026",
          "source": "kairos-groundbreaking"
        }
      ],
      "history": [
        {
          "date": "2026-04-17",
          "event": "Kairos says it broke ground on Hermes 2 in Oak Ridge, its first deployment under its Google reactor-fleet deal; planned output is up to 50 MW to the TVA grid.",
          "proposal_id": "kairos-hermes2-groundbreaking-2026",
          "reported_at": null,
          "source": "kairos-groundbreaking"
        }
      ],
      "hn": [],
      "id": "kairos-hermes2-groundbreaking-2026",
      "kind": "agreement",
      "origin": "upstream",
      "original_announcement_date": null,
      "position_changes": {
        "basis": [
          "kairos-groundbreaking"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "reported_at": null,
      "section": "ai",
      "title": "Kairos reports groundbreaking for Google-linked Hermes 2",
      "topics": [],
      "uncertain": {
        "items": [
          "Groundbreaking does not establish operating authorization or delivered electricity. Hermes 2 is separate from the Hermes 1 construction project."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "kairos-groundbreaking"
        ],
        "text": "Kairos says it broke ground on Hermes 2 in Oak Ridge, its first deployment under its Google reactor-fleet deal; planned output is up to 50 MW to the TVA grid."
      }
    },
    {
      "actors": [
        "ENTERGY",
        "META"
      ],
      "change_my_mind": null,
      "date": "2026-03-27",
      "evidence": [
        {
          "shows": "RAYVILLE, La. – Entergy Louisiana today announced an additional agreement with Meta to support the hyperscale data center in Northeast Louisiana. Structured to ensure Meta pays its full cost of service, the agreement is expected to deliver approximately $2 billion in customer savings to Entergy Louisiana customers over 20 years, in addition to the $650 million previously announced.",
          "source": "meta-entergy-expansion"
        },
        {
          "shows": "Not only are there customer power bill benefits, but also reliability benefits for all customers. To support this project and broader energy system needs, Entergy Louisiana plans a comprehensive buildout of generation, transmission and storage infrastructure, paid for by Meta, including:",
          "source": "meta-entergy-expansion"
        },
        {
          "shows": "- Seven new natural gas-fueled combined-cycle power plants totaling more than 5,200 megawatts, with capability for future carbon capture and hydrogen co-firing",
          "source": "meta-entergy-expansion"
        },
        {
          "shows": "Mar 27, 2026",
          "source": "meta-entergy-expansion"
        }
      ],
      "history": [
        {
          "date": "2026-03-27",
          "event": "Entergy announces an additional agreement for Meta’s northeast Louisiana data center, with a planned buildout including seven combined-cycle gas plants totaling more than 5,200 MW and new transmission.",
          "proposal_id": "entergy-meta-expanded-power-plan-2026",
          "reported_at": null,
          "source": "meta-entergy-expansion"
        }
      ],
      "hn": [],
      "id": "entergy-meta-expanded-power-plan-2026",
      "kind": "agreement",
      "origin": "upstream",
      "original_announcement_date": null,
      "position_changes": {
        "basis": [
          "meta-entergy-expansion"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [],
      "reported_at": null,
      "section": "ai",
      "title": "Entergy and Meta announce larger Louisiana power buildout",
      "topics": [],
      "uncertain": {
        "items": [
          "Company savings estimates and Meta paying full costs are interested-party claims, not independently verified bill effects. No inference that 2025 approval covers 2026 expansion. Later approval or completed construction not established."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "meta-entergy-expansion"
        ],
        "text": "Entergy announces an additional agreement for Meta’s northeast Louisiana data center, with a planned buildout including seven combined-cycle gas plants totaling more than 5,200 MW and new transmission."
      }
    },
    {
      "actors": [
        "OPENAI",
        "GAPOWER"
      ],
      "change_my_mind": null,
      "date": "2026-11-02",
      "evidence": [
        {
          "shows": "Our agreement with Georgia Power also includes up to 1,000 megawatts of flexible demand response, freeing up power to help keep air conditioning running in hundreds of thousands of homes during extreme heat.",
          "source": "openai-grid-protectors-2026"
        },
        {
          "shows": "Although the campus is still in development, we intend for Effingham to serve as a pilot for Grid Protectors, building on an agreement that already provides a model for future campuses.",
          "source": "openai-grid-protectors-2026"
        },
        {
          "shows": "For our planned Effingham County campus, we have committed to pay the full infrastructure and electric-service costs required to serve the project.",
          "source": "openai-grid-protectors-2026"
        },
        {
          "shows": "The arrangements will differ by location, and we will share additional commitments as they are finalized.",
          "source": "openai-grid-protectors-2026"
        }
      ],
      "history": [
        {
          "date": "2026-11-02",
          "event": "OpenAI announced Grid Protectors, described its Georgia Power agreement as including up to 1,000 MW of flexible demand response, and separately described its planned Effingham campus as an intended pilot.",
          "proposal_id": "openai-grid-protectors-effingham-2026",
          "reported_at": "2026-11-02",
          "source": "openai-grid-protectors-2026"
        }
      ],
      "hn": [],
      "id": "openai-grid-protectors-effingham-2026",
      "kind": "agreement",
      "origin": "upstream",
      "original_announcement_date": null,
      "position_changes": {
        "basis": [
          "openai-grid-protectors-2026"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": {
        "claim": "OpenAI says its Georgia Power agreement includes up to 1,000 MW of flexible demand response and that it intends the planned Effingham campus to serve as a Grid Protectors pilot.",
        "claim_source": "openai-grid-protectors-2026",
        "current_evidence": [],
        "deadline": null,
        "delivery_criteria": "Primary-source confirmation that the campus is operating and demand-response capability has been commissioned or dispatched.",
        "ladder": "announced",
        "outcome": "unclear",
        "outcome_note": "The campus remains in development; operating capacity and realized curtailment are not established."
      },
      "relationships": [
        "R-GAPOWER-OAI-DR"
      ],
      "reported_at": "2026-11-02",
      "section": "ai",
      "title": "OpenAI describes Grid Protectors and a Georgia Power demand-response agreement",
      "topics": [],
      "uncertain": {
        "items": [
          "The agreement’s inception date, activation conditions and demonstrated performance are not established in the source.",
          "Up to 1,000 MW is OpenAI’s stated flexible demand-response provision, not delivered generation or demonstrated curtailment.",
          "The commitment to pay infrastructure and electric-service costs is OpenAI’s statement; payment and ratepayer outcomes are not independently established."
        ],
        "label": "Limitations"
      },
      "watch_next": [
        {
          "date": null,
          "text": "Evidence that the Effingham campus is operating and demand response has been commissioned or dispatched."
        }
      ],
      "what_happened": {
        "sources": [
          "openai-grid-protectors-2026"
        ],
        "text": "OpenAI launched Grid Protectors and says its Georgia Power agreement includes up to 1,000 MW of flexible demand response. Separately, OpenAI says it intends its planned Effingham campus to serve as a pilot. The campus is still in development; operation and realized curtailment are not established."
      }
    },
    {
      "actors": [
        "CEG",
        "GOOG"
      ],
      "change_my_mind": null,
      "date": "2026-10-06",
      "evidence": [
        {
          "shows": "The 20-year power purchase agreement will enable investments in new equipment and technology at 11 Constellation-owned nuclear units in Illinois, Pennsylvania, and New Jersey, increasing thermal and electrical efficiency to unlock additional reliable, firm power to serve the grid. This capacity is entirely new, expanding total electricity generation available across the PJM footprint. The agreement helps sustain roughly 4,400 existing jobs, creates approximately 7,200 new construction jobs during the building period and represents more than $4.3 billion of new investment by Constellation.",
          "source": "ceg-google-890mw-2026"
        },
        {
          "shows": "Across six nuclear sites in Illinois, Pennsylvania and New Jersey, the agreement helps sustain roughly 4,400 existing jobs, creates approximately 7,200 new construction jobs during the building period and represents more than $4.3 billion of new investment by Constellation.",
          "source": "ceg-google-890mw-2026"
        },
        {
          "shows": "In addition to expanding nuclear generation, the companies entered into a 15-year energy supply agreement for an additional 2,700 MWs in PJM's fleet. This financial structure ensures that Constellation's operating generation assets continue to deliver energy and capacity to the PJM market.",
          "source": "ceg-google-890mw-2026"
        },
        {
          "shows": "first uprate expected to be delivered by 2028.",
          "source": "ceg-google-890mw-2026"
        }
      ],
      "history": [
        {
          "date": "2026-10-06",
          "event": "On October 6, 2026, Google and Constellation announced a 20-year PPA supporting 890 MW of planned incremental nuclear uprates at 11 units in Illinois, Pennsylvania and New Jersey, representing more than $4.3B of investment. The first uprate is expected by 2028. Separately, the parties entered a 15-year agreement for 2,700 MW of energy and capacity from existing PJM generation.",
          "source": "ceg-google-890mw-2026"
        }
      ],
      "hn": [],
      "id": "constellation-google-pjm-uprates-2026",
      "kind": "agreement",
      "origin": "upstream",
      "position_changes": {
        "basis": [
          "ceg-google-890mw-2026"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [
        "R-CEG-GOOG"
      ],
      "section": "ai",
      "title": "Google–Constellation: 890 MW nuclear uprates PPA and 2,700 MW PJM supply deal",
      "topics": [],
      "uncertain": {
        "items": [
          "The 890 MW uprates are planned, not operating capacity; the first is expected by 2028. The separate 2,700 MW supply agreement concerns existing PJM generation, not additional generating capacity. Initial supply commencement is not established here.",
          "The Google agreement spans six sites in Illinois, Pennsylvania and New Jersey. Exact overlap with DOE’s eight-plant financing portfolio has not been independently reconciled; do not add financing and PPA capacity totals."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "ceg-google-890mw-2026"
        ],
        "text": "On October 6, 2026, Google and Constellation announced a 20-year PPA supporting 890 MW of planned incremental nuclear uprates at 11 units in Illinois, Pennsylvania and New Jersey, representing more than $4.3B of investment. The first uprate is expected by 2028. Separately, the parties entered a 15-year agreement for 2,700 MW of energy and capacity from existing PJM generation."
      }
    },
    {
      "actors": [
        "CEG",
        "AMZN"
      ],
      "change_my_mind": null,
      "date": "2026-09-30",
      "evidence": [
        {
          "shows": "The expansion of Calvert Cliffs' generating capacity will be supported by a 20-year agreement, which includes 690 megawatts of power, including the 190 megawatt uprate. The parties have also entered into a related retail supply agreement to support Amazon operations in the 13-state PJM market. In addition to making the uprate possible, Amazon's long-term commitment will help provide Constellation with the revenue certainty to relicense the plant for another 20 years and make progress toward the development of new clean energy power plants at the site, adding to Maryland’s supply of clean and reliable energy.",
          "source": "ceg-amazon-calvert-cliffs-2026"
        },
        {
          "shows": "The agreement will enable more than $3 billion in Maryland infrastructure investment, including state-of-the-art improvements across the entire 1,790-megawatt plant and approximately 190 megawatts in total of new, emissions-free generating capacity coming online between 2030 and 2032.",
          "source": "ceg-amazon-calvert-cliffs-2026"
        },
        {
          "shows": "All the electricity generated by Calvert Cliffs will continue flowing to the PJM regional grid just as it does now, demonstrating how large energy users can support investments in new, reliable generation while strengthening the broader electric system.",
          "source": "ceg-amazon-calvert-cliffs-2026"
        }
      ],
      "history": [
        {
          "date": "2026-09-30",
          "event": "Constellation and Amazon announced a 20-year PPA for 690 MW of nuclear power from the Calvert Cliffs Clean Energy Center in Maryland, enabling more than $3B in Constellation investment to modernize the plant and add 190 MW of incremental nuclear uprate capacity expected online between 2030 and 2032.",
          "source": "ceg-amazon-calvert-cliffs-2026"
        }
      ],
      "hn": [],
      "id": "constellation-amazon-calvert-cliffs-2026",
      "kind": "agreement",
      "origin": "upstream",
      "position_changes": {
        "basis": [
          "ceg-amazon-calvert-cliffs-2026"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [
        "R-CEG-AMZN"
      ],
      "section": "ai",
      "title": "Constellation–Amazon: 20-year, 690 MW Calvert Cliffs PPA (including 190 MW uprates)",
      "topics": [],
      "uncertain": {
        "items": [
          "The 190 MW uprate is included within the 690 MW agreement, not additional to it; incremental capacity is targeted for 2030–2032 and remains subject to approvals. Initial delivery date is not established.",
          "All output continues to the PJM grid; this is not a dedicated physical wire to Amazon. DOE portfolio overlap does not establish that every MW is identically financed."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "ceg-amazon-calvert-cliffs-2026"
        ],
        "text": "Constellation and Amazon announced a 20-year PPA for 690 MW of nuclear power from the Calvert Cliffs Clean Energy Center in Maryland, enabling more than $3B in Constellation investment to modernize the plant and add 190 MW of incremental nuclear uprate capacity expected online between 2030 and 2032."
      }
    },
    {
      "actors": [
        "DOE",
        "CEG"
      ],
      "change_my_mind": null,
      "date": "2026-10-27",
      "evidence": [
        {
          "shows": "October 27, 2026",
          "source": "doe-ceg-5b-conditional-2026"
        },
        {
          "shows": "The U.S. Department of Energy’s (DOE) Office of Energy Dominance Financing (EDF) today announced a conditional loan commitment of up to $5 billion to finance nuclear uprates and modernization across Constellation Energy’s nuclear fleet in Illinois, Maryland, and Pennsylvania. The modernization efforts will add nearly 1.1 gigawatts (GW) of electricity, strengthening the grid and lowering costs for millions of Americans across the PJM Interconnection, L.L.C. (PJM) and Midcontinent Independent System Operator (MISO) regions.",
          "source": "doe-ceg-5b-conditional-2026"
        },
        {
          "shows": "Constellation’s planned investments at Braidwood, Byron, Clinton, Dresden, LaSalle, and Quad Cities in Illinois; Calvert Cliffs in Maryland; and Limerick in Pennsylvania will produce more electricity from existing nuclear plants, maximizing America’s existing energy infrastructure while supporting growing demand for affordable, reliable, and secure power. EDF’s conditional loan commitment also includes an option to finance future uprate projects at additional Constellation facilities.",
          "source": "doe-ceg-5b-conditional-2026"
        },
        {
          "shows": "While this conditional commitment indicates DOE’s intent to provide a loan, Constellation must satisfy certain technical, legal, environmental, and financial conditions before the Department enters into definitive financing documents and funds the loan.",
          "source": "doe-ceg-5b-conditional-2026"
        }
      ],
      "history": [
        {
          "date": "2026-10-27",
          "event": "The U.S. Department of Energy's Office of Energy Dominance Financing announced a conditional loan commitment of up to $5 billion to Constellation to finance nuclear uprates and modernization adding nearly 1.1 GW across eight nuclear plants in Illinois (Braidwood, Byron, Clinton, Dresden, LaSalle, Quad Cities), Maryland (Calvert Cliffs), and Pennsylvania (Limerick).",
          "source": "doe-ceg-5b-conditional-2026"
        }
      ],
      "hn": [],
      "id": "doe-constellation-uprates-conditional-loan-2026",
      "kind": "financing",
      "origin": "upstream",
      "position_changes": {
        "basis": [
          "doe-ceg-5b-conditional-2026"
        ],
        "items": [],
        "label": "Interpretation"
      },
      "promise": null,
      "relationships": [
        "R-DOE-CEG-UPRATES"
      ],
      "section": "ai",
      "title": "DOE EDF issues up-to-$5B conditional loan commitment for Constellation nuclear uprates",
      "topics": [],
      "uncertain": {
        "items": [
          "This is a conditional loan commitment, not financial close or funds disbursement; Constellation must satisfy technical, legal, environmental, and financial conditions before definitive loan execution.",
          "DOE financing does not create a separate additional block of generating capacity. Its portfolio overlaps Constellation uprate activity, but exact MW-by-MW equivalence to the Google, Amazon and Walmart PPAs has not been established; do not add the nearly 1.1 GW financing headline to PPA capacity totals."
        ],
        "label": "Limitations"
      },
      "watch_next": [],
      "what_happened": {
        "sources": [
          "doe-ceg-5b-conditional-2026"
        ],
        "text": "The U.S. Department of Energy's Office of Energy Dominance Financing announced a conditional loan commitment of up to $5 billion to Constellation to finance nuclear uprates and modernization adding nearly 1.1 GW across eight nuclear plants in Illinois (Braidwood, Byron, Clinton, Dresden, LaSalle, Quad Cities), Maryland (Calvert Cliffs), and Pennsylvania (Limerick)."
      }
    },
    {
      "id": "openai-community-compact-2026",
      "actors": [
        "OPENAI"
      ],
      "date": "2026-11-05",
      "reported_at": "2026-11-05",
      "kind": "announcement",
      "section": "energy",
      "title": "OpenAI publishes commitments for future compute campuses",
      "topics": [],
      "what_happened": {
        "text": "OpenAI published a National Community Compact for future compute campuses it owns and operates, alongside a policy blueprint. The compact commits to covering electricity and infrastructure costs, financial assurances before major spending, and local reporting. The blueprint proposes rules for compute-campus development.",
        "sources": [
          "fresh-source-openai-community-compact-2026"
        ]
      },
      "evidence": [
        {
          "source": "fresh-source-openai-community-compact-2026",
          "shows": "OpenAI published a National Community Compact for future compute campuses it owns and operates, alongside a policy blueprint. The compact commits to covering electricity and infrastructure costs, financial assurances before major spending, and local reporting. The blueprint proposes rules for compute-campus development."
        }
      ],
      "history": [],
      "promise": null,
      "relationships": [],
      "hn": [],
      "position_changes": {
        "label": "Interpretation",
        "items": [],
        "basis": [
          "fresh-source-openai-community-compact-2026"
        ]
      },
      "uncertain": {
        "label": "Limitations",
        "items": []
      },
      "watch_next": [],
      "change_my_mind": null
    }
  ],
  "relationships": [
    {
      "assets": [],
      "id": "R-CEG-MSFT",
      "label": "Signed PPA for power from a proposed Crane restart; restart authorization pending",
      "moves": [
        "crane-restart"
      ],
      "origin": "upstream",
      "section": "ai",
      "since": null,
      "source_actor": "CEG",
      "sources": [
        "crane-nrc",
        "s-fr-crane",
        "s-ceg-crane"
      ],
      "status": "announced",
      "target_actor": "MSFT",
      "type": "power",
      "until": null,
      "upstream_review": "semantic_reviewed"
    },
    {
      "assets": [],
      "id": "R-FERC-RTOS",
      "label": "FERC large-load show-cause proceedings; participation-office page reports pending November responses, not final rules",
      "moves": [
        "ferc-large-load-proceeding-status-2026"
      ],
      "origin": "upstream",
      "section": "ai",
      "since": "2026-06-18",
      "source_actor": "FERC",
      "sources": [
        "s-ferc-ctcp",
        "s-ferc-showcause"
      ],
      "status": "announced",
      "target_actor": "RTOS",
      "type": "rule",
      "until": null,
      "upstream_review": "semantic_reviewed"
    },
    {
      "assets": [],
      "id": "R-NRC-CEG",
      "label": "NRC reports Crane EA/FONSI issuance September 18, 2026; restart licensing remains separate",
      "moves": [
        "crane-restart"
      ],
      "origin": "upstream",
      "section": "ai",
      "since": null,
      "source_actor": "NRC",
      "sources": [
        "crane-nrc",
        "s-fr-crane",
        "s-ceg-crane"
      ],
      "status": "active",
      "target_actor": "CEG",
      "type": "rule",
      "until": null,
      "upstream_review": "semantic_reviewed"
    },
    {
      "assets": [],
      "id": "R-GAPOWER-OAI-DR",
      "label": "OpenAI describes an existing Georgia Power agreement with up to 1,000 MW of flexible demand response; operation and realized curtailment are not established",
      "moves": [
        "openai-grid-protectors-effingham-2026"
      ],
      "origin": "upstream",
      "section": "ai",
      "since": null,
      "source_actor": "GAPOWER",
      "sources": [
        "openai-grid-protectors-2026"
      ],
      "status": "announced",
      "target_actor": "OPENAI",
      "type": "power",
      "until": null,
      "upstream_review": "semantic_reviewed"
    },
    {
      "assets": [],
      "id": "R-CEG-GOOG",
      "label": "20-year PPA supporting 890 MW of planned nuclear uprates, first expected by 2028; separate 15-year, 2,700 MW PJM energy and capacity supply agreement",
      "moves": [
        "constellation-google-pjm-uprates-2026"
      ],
      "origin": "upstream",
      "section": "ai",
      "since": null,
      "source_actor": "CEG",
      "sources": [
        "ceg-google-890mw-2026"
      ],
      "status": "announced",
      "target_actor": "GOOG",
      "type": "power",
      "until": null,
      "upstream_review": "semantic_reviewed"
    },
    {
      "assets": [],
      "id": "R-CEG-AMZN",
      "label": "20-year, 690 MW Calvert Cliffs nuclear PPA in Maryland, including 190 MW of planned nuclear uprates expected 2030–2032",
      "moves": [
        "constellation-amazon-calvert-cliffs-2026"
      ],
      "origin": "upstream",
      "section": "ai",
      "since": null,
      "source_actor": "CEG",
      "sources": [
        "ceg-amazon-calvert-cliffs-2026"
      ],
      "status": "announced",
      "target_actor": "AMZN",
      "type": "power",
      "until": null,
      "upstream_review": "semantic_reviewed"
    },
    {
      "assets": [],
      "id": "R-DOE-CEG-UPRATES",
      "label": "Up to $5B conditional commitment for Constellation nuclear uprates; not closed or funded",
      "moves": [
        "doe-constellation-uprates-conditional-loan-2026"
      ],
      "origin": "upstream",
      "section": "ai",
      "since": null,
      "source_actor": "DOE",
      "sources": [
        "doe-ceg-5b-conditional-2026"
      ],
      "status": "announced",
      "target_actor": "CEG",
      "type": "finance",
      "until": null,
      "upstream_review": "semantic_reviewed"
    },
    {
      "assets": [],
      "id": "R-DOE-CEG",
      "label": "DOE closed a $1B Crane restart loan to Constellation Energy Generation, LLC; closing does not establish full drawdown or restart approval",
      "moves": [
        "crane-restart"
      ],
      "origin": "upstream",
      "section": "ai",
      "since": "2025-11-18",
      "source_actor": "DOE",
      "sources": [
        "doe-crane-close-2025"
      ],
      "status": "active",
      "target_actor": "CEG",
      "type": "finance",
      "until": null,
      "upstream_review": "semantic_reviewed"
    },
    {
      "assets": [],
      "id": "R-CEG-META",
      "label": "20-yr PPA, 1,121 MW Clinton from June 2027",
      "moves": [
        "ceg-meta-clinton"
      ],
      "section": "energy",
      "since": "2025-06-03",
      "source_actor": "CEG",
      "sources": [
        "a-ceg-meta"
      ],
      "status": "announced",
      "target_actor": "META",
      "type": "power",
      "until": null
    },
    {
      "assets": [],
      "id": "R-KAIROS-TVA",
      "label": "Hermes 2 PPA, up to 50 MW to TVA's grid (2030 target)",
      "moves": [
        "kairos-tva-hermes2"
      ],
      "section": "energy",
      "since": "2025-08-18",
      "source_actor": "KAIROS",
      "sources": [
        "a-goog-kairos-tva",
        "a-kairos-tva"
      ],
      "status": "announced",
      "target_actor": "TVA",
      "type": "power",
      "until": null
    },
    {
      "assets": [],
      "id": "R-TVA-GOOG",
      "label": "Passes Hermes 2 clean-energy attributes to Google's TN/AL data centers",
      "moves": [
        "kairos-tva-hermes2"
      ],
      "section": "energy",
      "since": "2025-08-18",
      "source_actor": "TVA",
      "sources": [
        "a-goog-kairos-tva"
      ],
      "status": "announced",
      "target_actor": "GOOG",
      "type": "power",
      "until": null
    },
    {
      "assets": [],
      "id": "R-CFS-GOOG",
      "label": "200 MW offtake from first ARC plant (Chesterfield, VA)",
      "moves": [
        "google-cfs-arc"
      ],
      "section": "energy",
      "since": "2025-06-30",
      "source_actor": "CFS",
      "sources": [
        "a-goog-cfs",
        "a-cfs-goog"
      ],
      "status": "announced",
      "target_actor": "GOOG",
      "type": "power",
      "until": null
    },
    {
      "assets": [],
      "id": "R-GOOG-CFS",
      "label": "Second capital investment in CFS",
      "moves": [
        "google-cfs-arc"
      ],
      "section": "energy",
      "since": "2025-06-30",
      "source_actor": "GOOG",
      "sources": [
        "a-goog-cfs"
      ],
      "status": "active",
      "target_actor": "CFS",
      "type": "equity",
      "until": null
    },
    {
      "assets": [],
      "id": "R-TXLEG-PUCT",
      "label": "SB 6 directs PUC large-load interconnection standards",
      "moves": [
        "texas-sb6"
      ],
      "section": "energy",
      "since": "2025-06-20",
      "source_actor": "TXLEG",
      "sources": [
        "a-tx-sb6"
      ],
      "status": "active",
      "target_actor": "PUCT",
      "type": "rule",
      "until": null
    },
    {
      "assets": [],
      "id": "R-PUCT-ERCOT",
      "label": "SB 6 large-load study, co-location notice and curtailment duties",
      "moves": [
        "texas-sb6"
      ],
      "section": "energy",
      "since": "2025-06-20",
      "source_actor": "PUCT",
      "sources": [
        "a-tx-sb6"
      ],
      "status": "active",
      "target_actor": "ERCOT",
      "type": "rule",
      "until": null
    },
    {
      "assets": [],
      "id": "R-NRC-HOLTEC",
      "label": "Licensing actions allowing fuel load at Palisades",
      "moves": [
        "palisades-restart"
      ],
      "section": "energy",
      "since": "2025-07-24",
      "source_actor": "NRC",
      "sources": [
        "a-nrc-palisades",
        "a-holtec-pal"
      ],
      "status": "active",
      "target_actor": "HOLTEC",
      "type": "rule",
      "until": null
    }
  ],
  "sources": [
    {
      "date": "2024-09-20",
      "date_note": null,
      "id": "s-ceg-crane",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "Constellation",
      "stype": "company",
      "stype_label": "Company",
      "title": "Constellation to Launch Crane Clean Energy Center, Restoring Jobs and Carbon-Free Power to The Grid",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Approved connection quotation and qualified relationship claim.",
        "status": "semantic_reviewed"
      },
      "url": "https://www.constellationenergy.com/news/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html"
    },
    {
      "date": "2026-09-25",
      "date_note": null,
      "id": "s-fr-crane",
      "kind": "regulator",
      "origin": "upstream",
      "publisher": "Federal Register (NRC)",
      "stype": "gov",
      "stype_label": "Government / regulator",
      "title": "Constellation Energy Generation, LLC; Christopher M. Crane Clean Energy Center; Environmental Assessment and Finding of No Significant Impact",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Approved connection quotation and qualified relationship claim.",
        "status": "semantic_reviewed"
      },
      "url": "https://www.federalregister.gov/documents/2026/09/25/2026-19603/constellation-energy-generation-llc-christopher-m-crane-clean-energy-center-environmental-assessment"
    },
    {
      "date": "2025-10-27",
      "date_note": null,
      "id": "s-nee-google",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "NextEra Energy",
      "stype": "company",
      "stype_label": "Company",
      "title": "NextEra Energy and Google Announce New Collaboration to Accelerate Nuclear Energy Deployment in the U.S.",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Approved connection quotation and qualified relationship claim.",
        "status": "semantic_reviewed"
      },
      "url": "https://www.investor.nexteraenergy.com/news-and-events/news-releases/2025/10-27-2025-203948689"
    },
    {
      "date": "2026-06-18",
      "date_note": null,
      "id": "s-ferc-showcause",
      "kind": "regulator",
      "origin": "upstream",
      "publisher": "FERC",
      "stype": "gov",
      "stype_label": "Government / regulator",
      "title": "FERC launches aggressive, targeted action to speed large load integration",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://www.ferc.gov/news-events/news/ferc-launches-aggressive-targeted-action-speed-large-load-integration"
    },
    {
      "date": null,
      "date_note": "Footer: This page was last updated on October 19, 2026. Initial publication date not established.",
      "id": "s-ferc-ctcp",
      "kind": "regulator",
      "last_updated": "2026-10-19",
      "origin": "upstream",
      "publisher": "FERC",
      "stype": "gov",
      "stype_label": "Government / regulator",
      "title": "Cost Transparency & Customer Protection (large-load proceedings page)",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://www.ferc.gov/cost-transparency-customer-protection"
    },
    {
      "date": "2026-08-17",
      "date_note": null,
      "id": "s-openai-pike",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "OpenAI",
      "stype": "company",
      "stype_label": "Company",
      "title": "OpenAI joins PORTS-Pike project",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Approved connection quotation and qualified relationship claim.",
        "status": "semantic_reviewed"
      },
      "url": "https://openai.com/index/openai-joins-ports-pike-project/"
    },
    {
      "date": "2026-10-19",
      "date_note": null,
      "id": "s-xe-amzn",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "X-energy",
      "stype": "company",
      "stype_label": "Company",
      "title": "X-energy, Amazon, American Electric Power Partner to Bring SMR Project to Indiana",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Approved connection quotation and qualified relationship claim.",
        "status": "semantic_reviewed"
      },
      "url": "https://x-energy.com/news/x-energy-amazon-american-electric-power-partner-to-bring-smr-project-to-indiana/"
    },
    {
      "date": "2026-06-18",
      "date_note": null,
      "id": "s-ercot-b0",
      "kind": "regulator",
      "origin": "upstream",
      "publisher": "ERCOT",
      "stype": "grid",
      "stype_label": "Grid operator / reliability body",
      "title": "PUCT Approves ERCOT's Batch Zero Process for Connecting Large Electricity Users While Protecting System Reliability",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Included proposal quotations and narrow claim; not full-source exhaustive validation.",
        "status": "semantic_reviewed"
      },
      "url": "https://www.ercot.com/news/release/06182026-puct-approves-ercots"
    },
    {
      "date": "2026-07-27",
      "date_note": null,
      "id": "hn-receipt",
      "kind": "hn",
      "origin": "upstream",
      "publisher": "Hypernovelty Institute",
      "stype": "hn",
      "stype_label": "HN analysis",
      "title": "The AI Power Deal Needs a Receipt",
      "upstream_check": {
        "status": "not_rereviewed_in_snapshot"
      },
      "url": "https://hypernovelty.institute/articles/the-ai-power-deal-needs-a-receipt/"
    },
    {
      "date": "2026-10-22",
      "date_note": "Date printed on the page (Oct 22, 2026); page metadata datePublished 2026-10-22T11:30:00+00:00.",
      "id": "s-google-voltus",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "Google (The Keyword blog)",
      "stype": "company",
      "stype_label": "Company",
      "title": "Google and Voltus to build 1-gigawatt virtual power plant",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Approved connection quotation and qualified relationship claim.",
        "status": "semantic_reviewed"
      },
      "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/virtual-power-plant-1-gigawatt/"
    },
    {
      "date": "2026-04-20",
      "date_note": "Date as printed on the page: 'Apr 20, 2026, 12:13 by Nicole Garcia'. The page says the workshop was held Thursday, April 16, 2026.",
      "id": "s-azcc-workshop-2026",
      "kind": "regulator",
      "origin": "upstream",
      "publisher": "Arizona Corporation Commission",
      "stype": "gov",
      "stype_label": "Government / regulator",
      "title": "ACC Data Center/Large Load Workshop Highlights",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://azcc.gov/news/home/2026/04/20/acc-large-load-data-center-workshop-highlights"
    },
    {
      "date": "2025-04-10",
      "date_note": "Date as printed on the page: 'Apr 10, 2025, 15:21 by Nicole Garcia'.",
      "id": "s-azcc-docket-2025",
      "kind": "regulator",
      "origin": "upstream",
      "publisher": "Arizona Corporation Commission",
      "stype": "gov",
      "stype_label": "Government / regulator",
      "title": "ACC Addresses Data Center Development; Ensure Customers are Financially Protected",
      "upstream_check": {
        "status": "not_rereviewed_in_snapshot"
      },
      "url": "https://www.azcc.gov/news/home/2025/04/10/acc-addresses-data-center-development--ensure-customers-are-financially-protected"
    },
    {
      "date": null,
      "date_note": "Living page states last reviewed October 8, 2026; dates inside refer to actions, not original page publication.",
      "id": "crane-nrc",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "NRC",
      "stype": "primary",
      "stype_label": "Primary source",
      "title": "Christopher M. Crane Clean Energy Center | Nuclear Regulatory Commission",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://www.nrc.gov/facilities-safety/facility-finder/reactors/ccec"
    },
    {
      "date": "2026-08-06",
      "date_note": null,
      "id": "crane-q2",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "Constellation",
      "stype": "primary",
      "stype_label": "Primary source",
      "title": "Constellation Reports Second Quarter 2026 Results",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Included proposal quotations and narrow claim; not full-source exhaustive validation.",
        "status": "semantic_reviewed"
      },
      "url": "https://www.constellationenergy.com/news/2026/08/constellation-reports-second-quarter-2026-results.html"
    },
    {
      "date": null,
      "date_note": "Board presentation dated September 14-15, 2026; URL directory September 11 is not established original publication date.",
      "id": "ercot-september",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "ERCOT",
      "stype": "primary",
      "stype_label": "Primary source",
      "title": "ERCOT Template",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Included proposal quotations and narrow claim; not full-source exhaustive validation.",
        "status": "semantic_reviewed"
      },
      "url": "https://www.ercot.com/files/docs/2026/09/11/14-Batch-Zero-Update.pdf"
    },
    {
      "date": "2026-09-08",
      "date_note": null,
      "id": "duane-close",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "NextEra Energy",
      "stype": "primary",
      "stype_label": "Primary source",
      "title": "U.S. Department of Energy Closes Up to $1.9 Billion Loan to Restart NextEra Energy's Duane Arnold Energy Center - Sep 8, 2026",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://newsroom.nexteraenergy.com/2026-09-08-U-S-Department-of-Energy-Closes-Up-to-1-9-Billion-Loan-to-Restart-NextEra-Energys-Duane-Arnold-Energy-Center"
    },
    {
      "date": null,
      "date_note": "Loan issuance states September 2026 only.",
      "id": "duane-doe",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "DOE",
      "stype": "primary",
      "stype_label": "Primary source",
      "title": "Duane Arnold | Department of Energy",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://www.energy.gov/edf/duane-arnold"
    },
    {
      "date": "2026-04-17",
      "date_note": null,
      "id": "kairos-groundbreaking",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "Kairos Power",
      "stype": "primary",
      "stype_label": "Primary source",
      "title": "Kairos Power Breaks Ground on Hermes 2 Demonstration Plant  | Kairos Power",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Approved connection quotation and qualified relationship claim.",
        "status": "semantic_reviewed"
      },
      "url": "https://www.kairospower.com/updates/kairos-power-breaks-ground-on-hermes-2-demonstration-plant"
    },
    {
      "date": "2026-03-27",
      "date_note": null,
      "id": "meta-entergy-expansion",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "Entergy",
      "stype": "primary",
      "stype_label": "Primary source",
      "title": "Entergy Louisiana announces a new agreement with Meta that will deliver an additional $2B in customer savings - Entergy",
      "upstream_check": {
        "reviewed_at": "2026-11-02T00:48:56.009607-07:00",
        "scope": "Approved connection quotation and qualified relationship claim.",
        "status": "semantic_reviewed"
      },
      "url": "https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings"
    },
    {
      "date": "2026-11-02",
      "date_note": null,
      "id": "openai-grid-protectors-2026",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "OpenAI",
      "stype": "primary",
      "stype_label": "Primary source",
      "title": "Introducing the Grid Protectors Program",
      "upstream_check": {
        "reviewed_at": "2026-11-03T18:01:55Z",
        "scope": "Exact included quotations and narrow qualified claims; not a full-source exhaustive validation.",
        "status": "semantic_reviewed"
      },
      "url": "https://openai.com/index/grid-protectors-program"
    },
    {
      "date": "2025-11-18",
      "date_note": null,
      "id": "doe-crane-close-2025",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "U.S. Department of Energy",
      "stype": "regulator",
      "stype_label": "Agency",
      "title": "Energy Department closes loan to restart nuclear power plant in Pennsylvania",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://www.energy.gov/articles/energy-department-closes-loan-restart-nuclear-power-plant-pennsylvania"
    },
    {
      "date": "2026-10-06",
      "date_note": null,
      "id": "ceg-google-890mw-2026",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "Constellation",
      "stype": "company",
      "stype_label": "Company",
      "title": "Google and Constellation announce 890 MW nuclear uprate agreement",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://www.constellationenergy.com/news/2026/10/google-and-constellation-announce-landmark-agreement-to-bring-890-mw-of-new-nuclear-capacity-to-pjm-grid.html"
    },
    {
      "date": "2026-09-30",
      "date_note": null,
      "id": "ceg-amazon-calvert-cliffs-2026",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "Constellation",
      "stype": "company",
      "stype_label": "Company",
      "title": "Constellation and Amazon announce Calvert Cliffs agreement",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://www.constellationenergy.com/news/2026/09/constellation-and-amazon-announce-20-year-power-purchase-agreement-at-calvert-cliffs.html"
    },
    {
      "date": "2026-10-27",
      "date_note": null,
      "id": "doe-ceg-5b-conditional-2026",
      "kind": "primary",
      "origin": "upstream",
      "publisher": "U.S. Department of Energy",
      "stype": "regulator",
      "stype_label": "Agency",
      "title": "Conditional loan commitment for Constellation nuclear uprates",
      "upstream_check": {
        "reviewed_at": "2026-11-05T04:32:29.025756+00:00",
        "scope": "Targeted corrected maintenance; not whole-map review",
        "status": "semantic_reviewed"
      },
      "url": "https://www.energy.gov/articles/energy-department-announces-5-billion-loan-boost-nuclear-power-and-help-lower-costs"
    },
    {
      "date": "2025-06-03",
      "date_note": null,
      "id": "a-ceg-meta",
      "kind": "primary",
      "publisher": "Constellation",
      "title": "Constellation, Meta sign 20-year deal for clean, reliable nuclear energy in Illinois",
      "url": "https://www.constellationenergy.com/news/2025/constellation-meta-sign-20-year-deal-for-clean-reliable-nuclear-energy-in-illinois.html",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2025-08-18",
      "date_note": null,
      "id": "a-goog-kairos-tva",
      "kind": "primary",
      "publisher": "Google",
      "title": "Google's first advanced nuclear reactor project with Kairos Power and TVA",
      "url": "https://blog.google/company-news/outreach-and-initiatives/sustainability/google-first-advanced-nuclear-reactor-project-with-kairos-power-and-tennessee-valley-authority/",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2025-08-18",
      "date_note": "Page metadata carries a later modification date (2026-10-13); dated from Google's Aug 18, 2025 post on the same deal.",
      "id": "a-kairos-tva",
      "kind": "primary",
      "publisher": "Kairos Power",
      "title": "Google, Kairos Power, TVA collaborate to meet America's growing energy needs",
      "url": "https://www.kairospower.com/updates/google-kairos-power-tva-collaborate-to-meet-americas-growing-energy-needs",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2025-06-30",
      "date_note": null,
      "id": "a-goog-cfs",
      "kind": "primary",
      "publisher": "Google",
      "title": "Our latest bet on a fusion-powered future",
      "url": "https://blog.google/company-news/outreach-and-initiatives/sustainability/our-latest-bet-on-a-fusion-powered-future/",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2025-06-30",
      "date_note": null,
      "id": "a-cfs-goog",
      "kind": "primary",
      "publisher": "Commonwealth Fusion Systems",
      "title": "Google and Commonwealth Fusion Systems sign strategic partnership",
      "url": "https://www.cfs.energy/news-and-media/google-and-commonwealth-fusion-systems-sign-strategic-partnership/",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2025-07-24",
      "date_note": null,
      "id": "a-doe-sites",
      "kind": "primary",
      "publisher": "U.S. Department of Energy",
      "title": "DOE announces site selection for AI data center and energy infrastructure development on federal lands",
      "url": "https://www.energy.gov/articles/doe-announces-site-selection-ai-data-center-and-energy-infrastructure-development-federal",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2025-09-30",
      "date_note": null,
      "id": "a-doe-oak",
      "kind": "primary",
      "publisher": "U.S. Department of Energy (EM)",
      "title": "U.S. Energy Department seeks proposals for AI data centers, energy projects at Oak Ridge",
      "url": "https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2025-11-04",
      "date_note": null,
      "id": "a-doe-pad",
      "kind": "primary",
      "publisher": "U.S. Department of Energy (EM)",
      "title": "U.S. Energy Department seeks proposals for AI data centers, energy projects at Paducah site",
      "url": "https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-paducah-site",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2025-12-17",
      "date_note": "PDF; date read from the release text via pdftotext.",
      "id": "a-pjm-bra",
      "kind": "primary",
      "publisher": "PJM Interconnection",
      "title": "PJM auction procures 134,479 MW of generation resources (2027/2028 BRA)",
      "url": "https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2025-releases/20251217-pjm-auction-procures-134479-mw-of-generation-resources.pdf",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2025-06-20",
      "date_note": "Page states 'Effective: 6-20-25'; the value is not in the raw HTML curl receives, so it was read via WebFetch.",
      "id": "a-tx-sb6",
      "kind": "primary",
      "publisher": "Texas Legislature Online",
      "title": "SB 6 (89R) enrolled bill summary",
      "url": "https://capitol.texas.gov/billlookup/BillSummary.aspx?Bill=SB6&LegSess=89R",
      "verified": {
        "checked": "2026-11-04",
        "method": "webfetch",
        "status": "ok"
      }
    },
    {
      "date": "2025-07-24",
      "date_note": "curl returned 403; read via WebFetch.",
      "id": "a-nrc-palisades",
      "kind": "primary",
      "publisher": "U.S. NRC",
      "title": "NRC approves major licensing actions required for restart of Palisades NPP (No. 25-046)",
      "url": "https://www.nrc.gov/cdn/doc-collection-news/2025/25-046.pdf",
      "verified": {
        "checked": "2026-11-04",
        "method": "webfetch",
        "status": "ok"
      }
    },
    {
      "date": "2025-08-25",
      "date_note": "Event date Aug 25, 2025; post published Aug 26, 2025.",
      "id": "a-holtec-pal",
      "kind": "primary",
      "publisher": "Holtec International",
      "title": "Historic First: Palisades transitions back to operations status",
      "url": "https://holtecinternational.com/hh-40-18/",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "date": "2026-10-21",
      "date_note": "Date from the EDGAR filing index for this exhibit.",
      "id": "a-tesla-q3",
      "kind": "primary",
      "publisher": "Tesla (SEC Form 8-K exhibit 99.1)",
      "title": "Tesla Q3 2026 Update",
      "url": "https://www.sec.gov/Archives/edgar/data/1318605/000162828026066738/exhibit9914.htm",
      "verified": {
        "checked": "2026-11-04",
        "method": "curl",
        "status": "ok"
      }
    },
    {
      "id": "fresh-source-openai-community-compact-2026",
      "publisher": "OpenAI",
      "title": "Setting a new standard for responsible AI infrastructure | OpenAI",
      "url": "https://openai.com/index/setting-new-standard-responsible-ai-infrastructure",
      "date": "2026-11-05",
      "date_note": null,
      "kind": "primary",
      "stype": "company",
      "stype_label": "Primary source"
    }
  ],
  "ui": {
    "board_help": "Bands: AI buyers & capital, Power & grid, Rules & land, Context.",
    "coverage": "U.S. only: selected power deals, firm generation and grid rules tied to large AI loads.",
    "families": {
      "equity": "equity",
      "finance": "finance",
      "power": "power",
      "rule": "rule"
    },
    "family_colors": {
      "equity": "#e3b54e",
      "finance": "#3ed6b5",
      "power": "#5aa9ff",
      "rule": "#ff6b8a"
    },
    "family_labels": {
      "equity": "holds equity in",
      "finance": "project financing",
      "power": "sells or routes power to",
      "rule": "sets rules for"
    },
    "kind": "board",
    "layer_map": {
      "capital": "buyers",
      "cloud": "buyers",
      "labs": "buyers",
      "policy": "policy",
      "power": "power",
      "robotics": "context",
      "silicon": "context"
    },
    "limits": "Cross-listed AI moves stay owned by AI: they are counted once, under AI, and appear here as “also in Energy”. Explicit include: azcc-large-load-workshop (a large-load rule proceeding whose only actor is in the policy layer). Does not track every utility tariff, every RTO filing or grids outside the U.S.",
    "method_html": "<h3>Coverage</h3><p>U.S. only: selected power deals, firm generation and grid rules tied to large AI loads.</p><h3>Evidence and interpretation</h3><p>Solid blocks summarize cited records. Dashed blocks are interpretation. Research preview: individual claim checks are incomplete. Retrieval and presence of a source do not prove a claim. Company-reported findings and study limitations remain in each record.</p><h3>Scope</h3><p>Power-purchase agreements, firm generation (nuclear, fusion), storage and grid rules that bear on large AI loads in the U.S.</p><h3>Limits</h3><p>Cross-listed AI moves stay owned by AI: they are counted once, under AI, and appear here as “also in Energy”. Explicit include: azcc-large-load-workshop (a large-load rule proceeding whose only actor is in the policy layer). Does not track every utility tariff, every RTO filing or grids outside the U.S.</p><h3>Dates and promises</h3><p>Partial source dates remain partial. Original promise claims, delivery criteria, deadlines, ladder and outcomes are retained without promotion. Date countdowns are shown only for full dates. Physical AI chokepoint scores are not applied to other sectors.</p>",
    "review_date": "2026-11-05",
    "scope": "Power-purchase agreements, firm generation (nuclear, fusion), storage and grid rules that bear on large AI loads in the U.S.",
    "section": "energy",
    "shape_fill": {
      "buyers": [
        "#2a2210",
        "#e3b54e"
      ],
      "context": [
        "#2a1019",
        "#ff6b8a"
      ],
      "policy": [
        "#0f2236",
        "#5aa9ff"
      ],
      "power": [
        "#0c2925",
        "#3ed6b5"
      ]
    },
    "source_types": {
      "company_self_report": "Company self-report",
      "company_usage_data": "Company analysis of its own usage data",
      "government_projection": "Government statistical projection",
      "institution_announcement": "Institution announcement (commitment)",
      "policy_action": "Policy action (input)"
    },
    "status": "active",
    "storage": "hn.chessmap.local-sector.energy",
    "strengths": {
      "moderate": "Official or multi-party source; method partly disclosed",
      "n/a": "An input or commitment, not evidence of an effect",
      "strong": "Independent measurement with method disclosed",
      "weak": "Single-party self-report or own-platform data"
    }
  },
  "source_checks": [
    {
      "source": "fresh-source-openai-community-compact-2026",
      "checked_date": "2026-11-09",
      "scope": "Selected dated primary-source development; not sector-wide freshness or causal clearance.",
      "status": "targeted_source_recheck"
    }
  ]
}